Sample Record

Owner Lab

  • CT D06 - Millbrook Field Laboratory

DIME Sample ID 2025-10-31-5

Project Information

Project IdentifiersProject ID: 1001195
DEA: 060Q5204
EFIS: 0613000190
DIST-CO-RTE-PM06-FRE-168-48.2
Award Date06/13/2025
Closeout DateNot set
Work DescriptionPLACE CONCRETE BARRIER AND STRUCTURAL CONCRETE BARRIER SLAB (SHAVER LAKE CONCRETE BARRIER RAIL UPGRADE).
Location DescriptionON STATE HIGHWAY IN FRESNO COUNTY NEAR SHAVER LAKE AT STEVENSON CREEK.
QA Service Level1 (Verified on 05/08/2025)

Sample Information

Sample Taken Date10/31/2025 Sample Unique Key5
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/31/2025
Sample typeAcceptance A brief description of the sample3/4 HMA - WMA
The quantity of what the sample constitutes50 Tons From where was the sample collectedManufacturer
First name of sampler or witnessed byJonathon Last name of sampler or witnessed bychaney
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan Ashlan Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix Number
Binder content (%)0.0 Virgin binder PG
Design binder PG Binder Supplier
RAP content (%)Not set WMA Additives
Antistrip type

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments