Sample Record

DIME Sample ID 2025-10-31-5

Project Information

Project IdentifiersProject ID: 1001195
DEA: 060Q5204
EFIS: 0613000190
DIST-CO-RTE-PM06-FRE-168-48.2
Award Date06/13/2025
Closeout Date07/27/2026
Work DescriptionPLACE CONCRETE BARRIER AND STRUCTURAL CONCRETE BARRIER SLAB (SHAVER LAKE CONCRETE BARRIER RAIL UPGRADE).
Location DescriptionON STATE HIGHWAY IN FRESNO COUNTY NEAR SHAVER LAKE AT STEVENSON CREEK.
QA Service Level1 (Verified on 05/08/2025)

Owner Lab

  • CT D06 - Millbrook Field Laboratory

Sample Information

Sample Taken Date10/31/2025 Sample Unique Key5
Date that the sample was received by the laboratory/organization performing the testing10/31/2025 Sample typeAcceptance
A brief description of the sample3/4 HMA - WMA The quantity of what the sample constitutes50 Tons
From where was the sample collectedManufacturer First name of sampler or witnessed byJonathon
Last name of sampler or witnessed bychaney Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameVulcan Ashlan
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix Number
Binder content (%)0.0 Virgin binder PG
Design binder PG Binder Supplier
RAP content (%)Not set WMA Additives
Antistrip type

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments