Sample Record

Owner Lab

  • G3 Quality, Incorporated - Cerritos

DIME Sample ID 2025-09-04-83

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 995125
DEA: 101E3004
EFIS: 1018000273
DIST-CO-RTE-PM10-SJ-5-32.5/49.8
Award Date01/12/2024
Closeout DateNot set
Work DescriptionREMOVE EXISTING PAVEMENT AND REPLACE WITH CONCRETE PAVEMENT.
Location DescriptionSAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM 0.2 MILE SOUTH OF HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE
QA Service Level1 (Verified on 09/26/2023)

Sample Information

Sample Taken Date09/04/2025 Sample Unique Key83
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/16/2025
Sample typeQuality Control A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes5 From where was the sample collectedJob Site
First name of sampler or witnessed byJustin Last name of sampler or witnessed byReynolds
Title of samplerField Technician Telephone number of sampler
Laboratory sample identification675APP Set 1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameVanguard Construction, Livermore Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number675APP
The truck number from where the sample was collectedLoad 4 Truck 135 The batch plant ticket number from where the sample was collected0
Concrete batch plantVanguard Livermore The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collected8 Mile Departure Transition Slab Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-09-04-83-1CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement ConcreteJustin Reynolds, G3 Quality, Incorporated - Cerritos09/04/202510/30/2025
Yes
10/30/2025Public - Test Data Visible
2025-09-04-83-2CTM 518-June 2010: Method of Test for Unit Weight of Fresh ConcreteJustin Reynolds, G3 Quality, Incorporated - Cerritos09/04/202510/30/2025
Yes
10/30/2025Public - Test Data Visible
2025-09-04-83-3CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure MethodJustin Reynolds, G3 Quality, Incorporated - Cerritos09/04/202510/30/2025
Yes
10/30/2025Public - Test Data Visible
2025-09-04-83-4CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement ConcreteJustin Reynolds, G3 Quality, Incorporated - Cerritos09/04/202510/30/2025
Yes
10/30/2025Public - Test Data Visible
2025-09-04-83-5CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTravis Van-Y, G3 Quality, Incorporated - Cerritos09/19/202510/30/2025
Yes
10/30/2025Public - Test Data Visible
2025-09-04-83-6CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTravis Van-Y, G3 Quality, Incorporated - Cerritos10/03/202510/30/2025
Yes
10/30/2025Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-09-04-83-1 CTM 557-June 2020 (Verified)
DIME Test ID: 2025-09-04-83-2 CTM 518-June 2010 (Verified)
DIME Test ID: 2025-09-04-83-3 CTM 504-June 2010 (Verified)
DIME Test ID: 2025-09-04-83-4 CTM 556-January 2018 (Verified)
DIME Test ID: 2025-09-04-83-5 CTM 521-June 2020 (Verified)
DIME Test ID: 2025-09-04-83-6 CTM 521-June 2020 (Verified)