Sample Record

DIME Sample ID 2025-10-15-20

Project Information

Project IdentifiersProject ID: 995493
DEA: 081G6704
EFIS: 0816000049
DIST-CO-RTE-PM08-RIV-79-5.4/11.4
Award Date05/23/2024
Closeout DateNot set
Work DescriptionHOT MIX ASPHALT, SOIL NAIL, STRUCTURAL CONCRETE AND ROADWAY EXC.
Location DescriptionRIVERSIDE COUNTY NEAR TEMECULA FROM 0.4 MILE SOUTH OF SAGE ROAD TO 1.1 MILES SOUTH OF PAUBA ROAD
QA Service Level1 (Verified on 12/18/2023)

Owner Lab

  • CT D08 - Fontana Southern Regional Laboratory

Sample Information

Sample Taken Date10/15/2025 Sample Unique Key20
Date that the sample was received by the laboratory/organization performing the testing10/17/2025 Sample typeProduction Start-Up
A brief description of the sample3/4" HMA A SP R25 LAS .5% The quantity of what the sample constitutes24 BX HMA 3 QT PG64-16 2BG CMB AGG 1 BG RAP
From where was the sample collectedManufacturer First name of sampler or witnessed byDYLAN
Last name of sampler or witnessed byNAULT Title of sampler
Telephone number of sampler Laboratory sample identification0649A-25
Linked DIME Sample ID The fabricator/manufacturer/facility nameMartin Marietta Lake Elsinore
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix Number53417195
Binder content (%)0.0 Virgin binder PG
Design binder PG Binder Supplier
RAP content (%)Not set WMA Additives
Antistrip type

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments