Sample Record

Owner Lab

  • Alta Vista Solutions - Whittier

DIME Sample ID 2025-08-21-91

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214649
DEA: 07316004
EFIS: 0715000194
DIST-CO-RTE-PM07-LA-14-60.70
Award Date02/07/2023
Closeout DateNot set
Work DescriptionREHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES.
Location DescriptionROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE.
QA Service Level1 (Verified on 01/29/2020)

Sample Information

Sample Taken Date08/21/2025 Sample Unique Key91
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/21/2025
Sample typeQuality Assurance A brief description of the sample6 x 12 LCB Cylinders
The quantity of what the sample constitutes950 CY From where was the sample collectedJob Site
First name of sampler or witnessed byManuel Last name of sampler or witnessed byUy
Title of samplerMaterials Tester Telephone number of sampler9495016042
Laboratory sample identification25-2783-2784-2785 Linked DIME Sample ID
The fabricator/manufacturer/facility nameN/A Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number12622-LCB-1
The truck number from where the sample was collectedTruck 5 The batch plant ticket number from where the sample was collectedLoad 95
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedJobsite Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-08-21-91-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersManuel Uy, Alta Vista Solutions - Whittier08/28/202510/10/2025
Yes
10/10/2025Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-08-21-91-1 CTM 521-June 2020 (Verified)