Sample Record
Owner Lab
- BSK Associates
DIME Sample ID 2025-06-02-120
Project Information
| Project Identifiers | Project ID: 212470 DEA: 044A1304 EFIS: 0400001106 COOP: 042718 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-101-18.5/18.5 |
| Award Date | 11/17/2023 |
| Closeout Date | Not set |
| Work Description | CONSISTS OF MODIFICATION AND RECONSTRUCTION OF THE EXISTING US 101/HEARN AVENUE INTERCHANGE IN SONOMA COUNTY, INCLUDING REPLACING THE EXISTING TWO-LANE HEARN AVENUE OVERCROSSING WITH A NEW OVERCROSSING, AND MODIFYING THE SOUTHBOUND OFF-RAMP IN CITY |
| Location Description | IN SONOMA COUNTY. |
| QA Service Level | 1 (Verified on 09/23/2019) |
Sample Information
| Sample Taken Date | 06/02/2025 | Sample Unique Key | 120 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/10/2025 |
| Sample type | Production Start-Up | A brief description of the sample | 3/4" HMA + 15% RAP |
| The quantity of what the sample constitutes | 16 boxes of 3/4" HMA with 15% RAP | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Masele | Last name of sampler or witnessed by | Poueu |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | D04-SE-25-028 | Linked DIME Sample ID | 2025-06-02-119 |
| The fabricator/manufacturer/facility name | BoDean Company | Transportation Laboratory (TL) Number | 100573-100574 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 1 |
| Sublot number | 1 | HMA Mix Number | 700SPW16 |
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | 15 | WMA Additives | |
| Antistrip type |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2025-06-02-120-1 | AASHTO T275-07r12: Standard Method of Test for Bulk Specific Gravity (Gmb) of Compacted Asphalt Mixtures Using Paraffin-Coated Specimens (Bulk Specific Gravity) | Trevor Hamilton - BSK, BSK Associates | 06/18/2025 | 10/08/2025 | No | Average Bulk Specific Gravity= 2.515 | |||
| 2025-06-02-120-2 | AASHTO T269-24E25: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void) | Trevor Hamilton - BSK, BSK Associates | 06/18/2025 | 10/08/2025 | No | Average Percent Air Voids=3.7% | |||
| 2025-06-02-120-3 | AASHTO T283-14: Standard Method of Test for Resistance of Compacted Asphalt Mixtures to Moisture-Induced Damage (Moisture Content) | Trevor Hamilton - BSK, BSK Associates | 06/17/2025 | 10/08/2025 | No | Wet=108 psi, Dry=117 psi, TSR=73.2% | |||
| 2025-06-02-120-4 | CTM 389-19: Method of Test for Hamburg Wheel-Track Testing of Compacted Hot Mix Asphalt | Trevor Hamilton - BSK, BSK Associates | 06/17/2025 | 10/08/2025 | No | H.W. > 15,000 passes, NO SIP |
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2025-06-02-120-1 AASHTO T275-07r12
DIME Test ID: 2025-06-02-120-2 AASHTO T269-24E25
DIME Test ID: 2025-06-02-120-3 AASHTO T283-14
DIME Test ID: 2025-06-02-120-4 CTM 389-19
