Sample Record

Owner Lab

  • CT D01 - Crescent City Field Laboratory

DIME Sample ID 2025-09-12-12

Project Information

Project IdentifiersProject ID: 215620
DEA: 01436404
EFIS: 0100000193
DIST-CO-RTE-PM01-DN-101-35.8/36.5
Award Date07/11/2022
Closeout DateNot set
Work DescriptionDr. Fine Bridge Replacement
Location DescriptionDR. FINE BRIDGE REPLACEMENT FROM LAKE EARL DR TO S FRED D. HAIGHT DR ON HWY 101 ACROSS SMITH RIVER.
QA Service Level1 (Verified on 03/26/2021)

Sample Information

Sample Taken Date09/12/2025 Sample Unique Key12
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/15/2025
Sample typeQuality Assurance A brief description of the sampleStem and soffit pour 6
The quantity of what the sample constitutes700 CY From where was the sample collectedJob Site
First name of sampler or witnessed byDeress Last name of sampler or witnessed byKahsay
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameTidewater Bar Pit Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberSR-minor structure NA
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedxxxx
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBack of truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-09-12-12-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersJoshua Erler, CT D01 - Crescent City Field Laboratory 09/19/202509/19/2025
Yes
09/19/20257 day breakPublic - Test Data Visible
2025-09-12-12-2CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersJoshua Erler, CT D01 - Crescent City Field Laboratory 09/26/202509/26/2025
Yes
09/26/202514 day breakPublic - Test Data Visible
2025-09-12-12-3CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersJoshua Erler, CT D01 - Crescent City Field Laboratory 10/10/202510/10/2025
Yes
10/10/2025Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-09-12-12-1 CTM 521-June 2020 (Verified)
DIME Test ID: 2025-09-12-12-2 CTM 521-June 2020 (Verified)
DIME Test ID: 2025-09-12-12-3 CTM 521-June 2020 (Verified)