Sample Record

Owner Lab

  • Alta Vista Solutions - Whittier

DIME Sample ID 2025-06-26-119

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 995193
DEA: 07356604
EFIS: 0719000026
DIST-CO-RTE-PM07-LA-605-R10.2/20.2
Award Date04/04/2024
Closeout DateNot set
Work DescriptionLANE & SLAB REPLACEMENT, COLD PLANE & HMA OVERLAY.
Location DescriptionLOS ANGELES COUNTY IN SANTA FE SPRINGS, PICO RIVERA, WHITTIER, CITY OF INDUSTRY AND EL MONTE FROM TELEGRAPH ROAD UNDERCROSSING TO ROUTE 605/10 SEPARATION
QA Service Level1 (Verified on 10/03/2023)

Sample Information

Sample Taken Date06/26/2025 Sample Unique Key119
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/26/2025
Sample typeQuality Assurance A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes20 CY From where was the sample collectedJob Site
First name of sampler or witnessed byFernando Last name of sampler or witnessed byCarranza
Title of samplerMaterials Tester Telephone number of sampler2132384209
Laboratory sample identification25-2093 Linked DIME Sample ID
The fabricator/manufacturer/facility nameN/A Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameNB 605 @ Whittier Blvd OS 15-2 Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberSC590B39
The truck number from where the sample was collectedTruck or Ticket 1559039 The batch plant ticket number from where the sample was collectedLoad 2
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedJobsite Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-06-26-119-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersFernando Carranza, Alta Vista Solutions - Whittier07/03/202509/12/2025
Yes
09/12/2025Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-06-26-119-1 CTM 521-June 2020 (Verified)