Sample Record

Owner Lab

  • CT D12 - Huntington Beach Field Laboratory

DIME Sample ID 2025-08-04-88

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215365
DEA: 120Q9704
EFIS: 1218000010
DIST-CO-RTE-PM12-ORA-405-0/11.4
Award Date07/27/2023
Closeout DateNot set
Work DescriptionI-405 improvement project from I-5 to Harbor Boulevard including extend pavement life, improve safety, enhance traffic operation, and incorporate Intelligent Transportation Systems (ITS).
Location DescriptionOrange County I-405 PM 0 - 11.4
QA Service Level1 (Verified on 07/01/2021)

Sample Information

Sample Taken Date08/04/2025 Sample Unique Key88
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/05/2025
Sample typeQuality Assurance A brief description of the sample4x8 concrete cylinders
The quantity of what the sample constitutes3 From where was the sample collectedJob Site
First name of sampler or witnessed byUnknown Last name of sampler or witnessed byUnknown
Title of sampler Telephone number of sampler
Laboratory sample identification25-0283 Linked DIME Sample ID
The fabricator/manufacturer/facility nameUnknown Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number3H40L021
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedUnknown
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedDischarge from concrete truck into wheelbarrow. Where the material sample would have been placed if not sampledCIDH Pile 106-025
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-08-04-88-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersDan Morris, CT D12 - Huntington Beach Field Laboratory09/01/202509/02/2025
Yes
09/02/2025Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-08-04-88-1 CTM 521-June 2020 (Verified)
File NameExtensionDate UploadedTest IDActions
25-0283pdf09/02/20252025-08-04-88-1   Info