Sample Record

Owner Lab

  • Alta Vista Solutions - Whittier

DIME Sample ID 2025-07-26-6

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 995193
DEA: 07356604
EFIS: 0719000026
DIST-CO-RTE-PM07-LA-605-R10.2/20.2
Award Date04/04/2024
Closeout DateNot set
Work DescriptionLANE & SLAB REPLACEMENT, COLD PLANE & HMA OVERLAY.
Location DescriptionLOS ANGELES COUNTY IN SANTA FE SPRINGS, PICO RIVERA, WHITTIER, CITY OF INDUSTRY AND EL MONTE FROM TELEGRAPH ROAD UNDERCROSSING TO ROUTE 605/10 SEPARATION
QA Service Level1 (Verified on 10/03/2023)

Sample Information

Sample Taken Date07/26/2025 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/26/2025
Sample typeQuality Assurance A brief description of the sampleClass 3 Aggregate Base
The quantity of what the sample constitutes170 SY From where was the sample collectedJob Site
First name of sampler or witnessed byRigoberto Last name of sampler or witnessed byArroyo
Title of samplerMaterials Tester Telephone number of sampler7605743880
Laboratory sample identification25-2407 Linked DIME Sample ID
The fabricator/manufacturer/facility nameN/A Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameSB-605 Lane #3 Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleClass 3 Aggregate Base The fabricator/manufacturer designation for the sampleCompactions Testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-07-26-6-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesRigoberto Arroyo, Alta Vista Solutions - Whittier07/26/202508/14/2025
Yes
08/14/2025Public - Test Data Visible
2025-07-26-6-2CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesRigoberto Arroyo, Alta Vista Solutions - Whittier07/26/202508/14/2025
Yes
08/14/2025Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-07-26-6-1 CTM 231-March 2013 (Verified)
DIME Test ID: 2025-07-26-6-2 CTM 216-June 2011 (Verified)