Sample Record

DIME Sample ID 2025-08-12-57

Project Information

Project IdentifiersProject ID: 215620
DEA: 01436404
EFIS: 0100000193
DIST-CO-RTE-PM01-DN-101-35.8/36.5
Award Date07/11/2022
Closeout DateNot set
Work DescriptionDr. Fine Bridge Replacement
Location DescriptionDR. FINE BRIDGE REPLACEMENT FROM LAKE EARL DR TO S FRED D. HAIGHT DR ON HWY 101 ACROSS SMITH RIVER.
QA Service Level1 (Verified on 03/26/2021)

Owner Lab

  • CT D01 - Crescent City Field Laboratory

Sample Information

Sample Taken Date08/12/2025 Sample Unique Key57
Date that the sample was received by the laboratory/organization performing the testing08/11/2025 Sample typeQuality Assurance
A brief description of the sample3/4 agg The quantity of what the sample constitutes500 yards
From where was the sample collectedSource First name of sampler or witnessed bylee
Last name of sampler or witnessed byrenick Title of sampler
Telephone number of sampler7076665918 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameTide Water
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberG3-15-STR-006F.
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedtidewater starry pit
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedcrescent city cement plant tidewater Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments