Sample Record

Owner Lab

  • CT D07 - Materials Field Laboratory, Unit 1953

DIME Sample ID 2025-08-09-1

Project Information

Project IdentifiersProject ID: 1000802
DEA: 07346804
EFIS: 0718000079
DIST-CO-RTE-PM07-VEN-232-0.4/R4.1
Award Date02/04/2025
Closeout DateNot set
Work DescriptionCOLD PLANE AND OVERLAY WITH HMA & RHMA.
Location DescriptionVENTURA COUNTY IN AND NEAR OXNARD FROM ROUTE 232/101 SEPARATION TO ROUTE 118
QA Service Level1 (Verified on 01/27/2025)

Sample Information

Sample Taken Date08/09/2025 Sample Unique Key1
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/09/2025
Sample typeAcceptance A brief description of the sampleAggregate Base
The quantity of what the sample constitutes211.48 From where was the sample collectedJob Site
First name of sampler or witnessed byChad Last name of sampler or witnessed byChotibhongs
Title of samplerMREA Telephone number of sampler2134076963
Laboratory sample identification25-2666 Linked DIME Sample ID
The fabricator/manufacturer/facility nameOn-Site Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)NA
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedCTM 231 Test Holes
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-08-09-1-1CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesChad Chotibhongs, CT D07 - Materials Field Laboratory, Unit 195308/09/202508/09/2025
Yes
08/09/2025Public - Test Data Visible
2025-08-09-1-2CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesChad Chotibhongs, CT D07 - Materials Field Laboratory, Unit 195308/09/202508/09/2025
Yes
08/09/2025Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-08-09-1-1 CTM 216-June 2011 (Verified)
DIME Test ID: 2025-08-09-1-2 CTM 231-March 2013 (Verified)