Sample Record

Owner Lab

  • CT D05 - Santa Maria Field Laboratory

DIME Sample ID 2025-05-29-116

Project Information

Project IdentifiersProject ID: 1000569
DEA: 051J8604
EFIS: 0518000081
DIST-CO-RTE-PM05-SLO-101-7.8/16.5
Award Date02/12/2025
Closeout DateNot set
Work DescriptionCOLD PLANE AC PAVEMENT, RHMA-G, DRAINAGE SYSTEMS AND BARRIERS.
Location DescriptionSAN LUIS OBISPO COUNTY IN AND NEAR ARROYO GRANDE AND PISMO BEACH FROM LOS BERROS ROAD UNDERCROSSING TO PISMO CREEK BRIDGE
QA Service Level1 (Verified on 09/09/2024)

Sample Information

Sample Taken Date05/29/2025 Sample Unique Key116
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/29/2025
Sample typeQuality Assurance A brief description of the sampleType II Cement
The quantity of what the sample constitutes10 CY From where was the sample collectedJob Site
First name of sampler or witnessed byIsaac Last name of sampler or witnessed byGleffe
Title of samplerTET Telephone number of sampler8053191237
Laboratory sample identification Linked DIME Sample ID2025-05-29-40
The fabricator/manufacturer/facility nameAlliance Ready Mix Arroyo Grande Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number635C3N0P
The truck number from where the sample was collected116 The batch plant ticket number from where the sample was collected24540
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBack of truck discharge chute Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-05-29-116-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersIsaac Gleffe, CT D05 - Santa Maria Field Laboratory06/05/202507/30/2025
Yes
08/04/20257-Day Compressive strength breaksPublic - Test Data Visible
2025-05-29-116-2CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersIsaac Gleffe, CT D05 - Santa Maria Field Laboratory06/26/202507/31/2025
Yes
08/04/202528-Day Compressive strength breaksPublic - Test Data Visible
2025-05-29-116-3CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement ConcreteIsaac Gleffe, CT D05 - Santa Maria Field Laboratory05/29/202507/30/2025
Yes
08/04/2025Max Slump 4Public - Test Data Visible
2025-05-29-116-4CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement ConcreteIsaac Gleffe, CT D05 - Santa Maria Field Laboratory05/29/202507/31/2025
Yes
08/05/2025Max Temp 90FPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-05-29-116-1 CTM 521-June 2020 (Verified)
DIME Test ID: 2025-05-29-116-2 CTM 521-June 2020 (Verified)
DIME Test ID: 2025-05-29-116-3 CTM 556-January 2018 (Verified)
DIME Test ID: 2025-05-29-116-4 CTM 557-June 2020 (Verified)