Sample Record
Owner Lab
- CT D07 - Materials Field Laboratory, Unit 1953
DIME Sample ID 2025-07-21-17
Project Information
| Project Identifiers | Project ID: 1000825 DEA: 07332304 EFIS: 0716000257 |
|---|---|
| DIST-CO-RTE-PM | 07-VEN-33-18.9/19.1 |
| Award Date | 02/20/2025 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT STRUCTURAL CONCRETE BARRIER SLAB AND CONCRETE BARRIER. |
| Location Description | VENTURA COUNTY NEAR OJAI FROM 0.5 MILE SOUTH OF BEAR CREEK BRIDGE TO 0.1 MILE NORTH OF NORTH FORK MATILIJA CREEK BRIDGE |
| QA Service Level | 1 (Verified on 01/27/2025) |
Sample Information
| Sample Taken Date | 07/21/2025 | Sample Unique Key | 17 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/22/2025 |
| Sample type | Acceptance | A brief description of the sample | 6X12 PCC cylinders |
| The quantity of what the sample constitutes | 130 CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Armando | Last name of sampler or witnessed by | Serratos |
| Title of sampler | Assistant Structure Representative | Telephone number of sampler | |
| Laboratory sample identification | 25-528 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | CTS SHORT LOAD RAPID SET | Transportation Laboratory (TL) Number | 116161 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | CTS-72-EHI |
|---|---|---|---|
| The truck number from where the sample was collected | NA | The batch plant ticket number from where the sample was collected | NA |
| Concrete batch plant | CTS | The fabricator/manufacturer designation for the sample | |
| A detailed description of where the material sample was collected | truck chute | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2025-07-21-17-1 CTM 521-June 2020 (Verified)
DIME Test ID: 2025-07-21-17-2 CTM 521-June 2020 (Verified)
DIME Test ID: 2025-07-21-17-3 CTM 521-June 2020 (Verified)
