Sample Record
Owner Lab
- CT D06 - Bakersfield Field Laboratory
DIME Sample ID 2025-07-14-46
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 1000900 DEA: 061G1804 EFIS: 0623000159 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-5-Var |
| Award Date | 03/19/2025 |
| Closeout Date | Not set |
| Work Description | FURNISH AND PLACE POLYESTER CONCRETE OVERLAY. |
| Location Description | KERN COUNTY AT VARIOUS LOCATIONS FROM GRAPEVINE CREEK BRIDGE TO KERN RIVER FLOOD CANAL BRIDGE |
| QA Service Level | 1 (Verified on 01/22/2025) |
Sample Information
| Sample Taken Date | 07/14/2025 | Sample Unique Key | 46 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/15/2025 |
| Sample type | Acceptance | A brief description of the sample | ISR (RSC) |
| The quantity of what the sample constitutes | 0-130 CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Mike | Last name of sampler or witnessed by | Cozad |
| Title of sampler | Plant Inspector | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CTS SHORT LOAD RAPID SET | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | CTS-65-EHI |
|---|---|---|---|
| The truck number from where the sample was collected | 1 | The batch plant ticket number from where the sample was collected | 1 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Volumetric Mixer | Where the material sample would have been placed if not sampled | iSR |
| From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2025-07-14-46-1 CTM 524-March 2013 (Verified)
| File Name | Extension | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|
| 06-1G1804_37023_250714_3D | 07/18/2025 | 2025-07-14-46-1 | Info |
