Sample Record

Owner Lab

  • CT D04 - San Jose Construction Field Laboratory

DIME Sample ID 2025-06-11-65

Project Information

Project IdentifiersProject ID: 993678
DEA: 042Q8004
EFIS: 0419000050
COOP: 042836,042944
DIST-CO-RTE-PM04-SM-101,92-US 101 & SR 92-10.9/12.1 & 11.8/13.4
Award Date01/22/2025
Closeout DateNot set
Work DescriptionUS 101/SR 92 INTERCHANGE AREA IMPROVEMENT :PROJECT WILL CONSTRUCT CONGESTION RELIEF IMPROVEMENTS AT THE US 101/SR 92 INTERCHANGE AREA.
Location DescriptionNot set
QA Service Level1 (Verified on 09/15/2022)

Sample Information

Sample Taken Date06/11/2025 Sample Unique Key65
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/11/2025
Sample typeQuality Assurance A brief description of the sampleNative AB Backfill
The quantity of what the sample constitutes2600g From where was the sample collectedJob Site
First name of sampler or witnessed byFernando Last name of sampler or witnessed byVega
Title of samplerMREA Telephone number of sampler
Laboratory sample identificationSJ-061125-BF1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameNative Material Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameHwy 92 WB Lt "FI" Line Drainage System No. 2 Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedJobsite - Compacted Native backfill
Where the material sample would have been placed if not sampled

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-06-11-65-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesFernando Vega, CT D04 - San Jose Construction Field Laboratory06/11/202506/18/2025
Yes
06/11/2025Hwy 92 WB Lt "FI" Line Drainage System No. 2Public - Test Data Visible
2025-06-11-65-2CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesCharles Poolis, CT D04 - San Jose Construction Field Laboratory06/11/202506/18/2025
Yes
06/11/2025Hwy 92 WB Lt "FI" Line Drainage System No. 2Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-06-11-65-1 CTM 231-March 2013 (Verified)
DIME Test ID: 2025-06-11-65-2 CTM 216-June 2011 (Verified)