Sample Record

Owner Labs

  • CT SC - 3675 - Santa Barbara 1
  • CT HQ - FFS - Skid Testing

DIME Sample ID 2025-06-16-6

Project Information

Project IdentifiersProject ID: 1000259
DEA: 050N74V4
EFIS: 0522000043
DIST-CO-RTE-PM05-SB-101-9.2/9.7
Award Date02/08/2024
Closeout DateNot set
Work DescriptionNot set
Location DescriptionFOR CONSTRUCTION ON STATE HIGHWAY IN SANTA BARBARA COUNTY AT MONTECITO FROM 0.2 MILE NORTH OF SHEFFIELD DRIVE UNDERCROSSING TO 0.3 MILE SOUTH OF SAN YSIDRO ROAD OVERCROSSING
QA Service Level1 (Verified on 04/15/2024)

Sample Information

Sample Taken Date06/16/2025 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing06/16/2025
Sample typeAcceptance A brief description of the sampleSkid Testing Request
The quantity of what the sample constitutesMultiple Lanes From where was the sample collectedJob Site
First name of sampler or witnessed byEMILIANO Last name of sampler or witnessed byBERNTSEN
Title of sampler Telephone number of sampler805-286-2394
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGRANITE CONSTRUCTION Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier51-0348, 51-0349, 51-0350 AND ADJACENT APPROACH SLABS, CRCP PAVEMENT
Structure nameROMERO CREEK BRIDGE, SAN YSIDRO CREEK BRIDGE, OAK CREEK BRIDGE AND ADJACENT CRCP PAVEMENTS Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedBehind K-Rail/Barrier DIST-CO-RTE05-SB-101
Direction of TravelNorth Post Mile9.20
Lanes to be TestedShoulder,On Ramp,Off Ramp,Lane #1,Lane #2,Lane #3 Station

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-06-16-6-1CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing06/27/202506/27/2025
Yes
06/27/2025ROMERO CREEK NB. ASLO TESTED: APPROACH SLAB .39-.34-.37= .37 AVG. DEPARTURE SLAB-.35-.36-.35=.35 AVGPublic - Test Data Visible
2025-06-16-6-2CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing06/26/202506/27/2025
Yes
06/27/2025SAN YSIDERO CREEK BR NB APPROACH SLAB:.35-.35-.37=.36 AVG DEPARTURE SLAB-.36-.35-.35=.35 AVGPublic - Test Data Visible
2025-06-16-6-4CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing06/26/202506/27/2025
Yes
06/27/2025ROMERO CREEK SB APPROACH SLAB .39-.34-.39= .37 AVG. DEPARTURE SLAB-.37-.37-.37=.37 AVGPublic - Test Data Visible
2025-06-16-6-5CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing06/27/202506/27/2025
Yes
06/27/2025OAK CREEK NB APPROACH SLAB .36-.35-.35=.35AVG DEPARTURE SLAB-.35-.37-.35=.35 AVGPublic - Test Data Visible
2025-06-16-6-6CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing06/26/202506/27/2025
Yes
06/27/2025OAK CREEK SB APPROACH SLAB .35-.35-.39= .36 AVG. DEPARTURE SLAB-.35-.37-.35=.36 AVGPublic - Test Data Visible
2025-06-16-6-7CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing06/26/202506/27/2025
Yes
06/27/2025SAN YSIDERO CREEK BR SB APPROACH SLAB:.35-.33-.37=.35 AVG DEPARTURE SLAB-.36-.36-.36=.36 AVGPublic - Test Data Visible
2025-06-16-6-8CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing06/27/202506/27/2025
Yes
06/27/2025MAINLINE BEGIN PROJECT TO SAN YSIDERO OFF RAMP VISUALLY INSPECTED ENTIRE ROADWAY SURFACE AND TESTED THE 2500 FT AREA. 600FT-1000FT AVG .34 1000FT-1500FT AVG .34 1600-FT-2100FT AVG .33 2100FT-2500FT AVG .33Public - Test Data Visible
2025-06-16-6-9CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing06/25/202506/27/2025
Yes
06/27/2025SB MAINLINE BEGIN PROJECT FROM SAN YSIDERO OFF RAMP VISUALLY INSPECTED ENTIRE ROADWAY SURFACE AND TESTED THE 2500 FT AREA. 500FT-900FT AVG .34 1000FT-1500FT AVG .35 1600-FT-2100FT AVG .34 2100FT-2500FT AVG .35Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-06-16-6-1 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-06-16-6-2 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-06-16-6-4 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-06-16-6-5 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-06-16-6-6 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-06-16-6-7 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-06-16-6-8 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-06-16-6-9 CTM 342-August 2012 (Verified)