Sample Record

DIME Sample ID 2025-05-28-70

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 1000245
DEA: 072XN104
EFIS: 0724000222
DIST-CO-RTE-PM07-VEN-150-
Award DateNot set
Closeout DateNot set
Work DescriptionRetaining wall repair due to landslide emergency at Route 150 in Santa Paula.
Location DescriptionRoute 150 in Santa Paula.
QA Service Level1 (Verified on 04/05/2024)

Owner Lab

  • Alta Vista Solutions - Whittier

Sample Information

Sample Taken Date05/28/2025 Sample Unique Key70
Date that the sample was received by the laboratory/organization performing the testing05/28/2025 Sample typeQuality Assurance
A brief description of the sampleNative The quantity of what the sample constitutes82 SY
From where was the sample collectedJob Site First name of sampler or witnessed byRigoberto
Last name of sampler or witnessed byArroyo Title of samplerMaterials Tester
Telephone number of sampler7605743880 Laboratory sample identification25-1676
Linked DIME Sample ID The fabricator/manufacturer/facility nameN/A
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameHWY 150 - MP20.45 Retaining Wall #1
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleNative The fabricator/manufacturer designation for the sampleCompaction Testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-05-28-70-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesRigoberto Arroyo, Alta Vista Solutions - Whittier05/28/202506/05/2025
Yes
06/05/2025Public - Test Data Visible
2025-05-28-70-2CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesRigoberto Arroyo, Alta Vista Solutions - Whittier05/28/202506/05/2025
Yes
06/05/2025Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-05-28-70-1 CTM 231-March 2013 (Verified)
DIME Test ID: 2025-05-28-70-2 CTM 216-June 2011 (Verified)