Sample Record
DIME Sample ID 2025-05-15-52
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 1000244 DEA: 120T9704 EFIS: 1223000009 MINOR: 12A2155 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-74,74-0.1, 2.3 |
| Award Date | 02/16/2024 |
| Closeout Date | 06/22/2026 |
| Work Description | INSTALL CCTVs, CAMERAS, AND RADIOS |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 04/10/2024) |
Owner Lab
- CT D12 - Huntington Beach Field Laboratory
Sample Information
| Sample Taken Date | 05/15/2025 | Sample Unique Key | 52 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/01/2025 | Sample type | Quality Assurance |
| A brief description of the sample | 4x8 concrete cylinders | The quantity of what the sample constitutes | 9 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Unknown |
| Last name of sampler or witnessed by | Unknown | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 25-0161 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Cemex / Irvine | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 1610898 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | Unknown | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Dischard fron concrete truck into wheelbarrow. | Where the material sample would have been placed if not sampled | For WET & DRY condition CIDH foundation |
| From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2025-05-15-52-1 CTM 521-June 2020 (Verified)
| File Name | Extension | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|
| 25-0161 | 05/22/2025 | 2025-05-15-52-1 | Info |
DIME Test ID: 2025-05-15-52-2 CTM 521-June 2020 (Verified)
| File Name | Extension | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|
| 25-0161-14D | 05/29/2025 | 2025-05-15-52-2 | Info |
DIME Test ID: 2025-05-15-52-3 CTM 521-June 2020 (Verified)
| File Name | Extension | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|
| 25-0161-28D | 06/12/2025 | 2025-05-15-52-3 | Info |
