Sample Record

DIME Sample ID 2025-03-27-44

Project Information

Project IdentifiersProject ID: 993446
DEA: 120J34U4
EFIS: 1218000034
DIST-CO-RTE-PM12-ORA-55,55-29.6,R6.4/10.3
Award Date05/27/2022
Closeout DateNot set
Work DescriptionCONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS.
Location DescriptionORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION
QA Service Level1 (Verified on 06/24/2022)

Owner Lab

  • CT D08 - Fontana Southern Regional Laboratory

Sample Information

Sample Taken Date03/27/2025 Sample Unique Key44
Date that the sample was received by the laboratory/organization performing the testing05/01/2025 Sample typeVerification
A brief description of the sample3/4" HMA A SP R15 0.50% LAS The quantity of what the sample constitutes24 BX HMA 4 QT PG64-10 1 QT LAS 2 BGS OF EA BN SZ 2 BGS RAP
From where was the sample collectedManufacturer First name of sampler or witnessed byJOHN
Last name of sampler or witnessed byMEJIA Title of sampler
Telephone number of sampler Laboratory sample identification0265A-25
Linked DIME Sample ID The fabricator/manufacturer/facility nameVulcan-Santa Ana
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix Number220817 SNA SJR
Binder content (%)Not set Virgin binder PGNot set
Design binder PGNot set Binder SupplierNot set
RAP content (%)Not set WMA AdditivesNot set
Antistrip typeNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments