Sample Record

DIME Sample ID 2025-04-05-13

Project Information

Project IdentifiersProject ID: 994582
DEA: 073203U4
EFIS: 0722000071
DIST-CO-RTE-PM07-LA-91,605-R16.6/R16.8,R0.0/R10.4
Award Date06/20/2023
Closeout DateNot set
Work DescriptionPLACE CONCRETE PAVEMENT AND HIGH FRICTION SURFACE TREATMENT.
Location DescriptionLOS ANGELES COUNTY ON ROUTE 605 FROM 0.2 MILE NORTH OF KATELLA AVENUE UNDECROSSING TO 0.1 MILE NORTH OF TELEGRAPH ROAD UNDERCROSSING AND ON ROUTE 91 FROM 0.4 MILE WEST OF ROUTE 605 UNDERCROSSING TO 0.2 MILE WEST OF ROUTE 605 UNDERCROSSING
QA Service Level1 (Verified on 07/12/2023)

Owner Lab

  • CT D07 - Materials Field Laboratory, Unit 1953

Sample Information

Sample Taken Date04/05/2025 Sample Unique Key13
Date that the sample was received by the laboratory/organization performing the testing04/06/2025 Sample typeAcceptance
A brief description of the sampleRapid set concrete beams The quantity of what the sample constitutes130 CY
From where was the sample collectedJob Site First name of sampler or witnessed byAndrew
Last name of sampler or witnessed bySquires Title of samplerG3 Field Technician
Telephone number of sampler909-771-6960 Laboratory sample identification25-1055
Linked DIME Sample ID The fabricator/manufacturer/facility nameVanguard Construction
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberHE4x12BM
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedNA
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete Truck Chute Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-04-05-13-1CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteMichelangelo Sese, CT D07 - Materials Field Laboratory, Unit 195304/15/202504/15/2025
Yes
04/15/2025SB Rte. 605 Connector between Telegraph & I-5Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-04-05-13-1 CTM 524-March 2013 (Verified)