Sample Record
Owner Lab
- ZT Consulting Group, Incorporated
DIME Sample ID 2023-09-11-110
Project Information
| Project Identifiers | Project ID: 994426 DEA: 081F9804 EFIS: 0815000087 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-215-17.5 |
| Award Date | 01/03/2023 |
| Closeout Date | Not set |
| Work Description | I-215/Holland Road New BR OC (SOP) |
| Location Description | City of Menifee |
| QA Service Level | 2 (Verified on 12/07/2022) |
Sample Information
| Sample Taken Date | 09/11/2023 | Sample Unique Key | 110 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 09/11/2023 |
| Sample type | Quality Control | A brief description of the sample | Concrete Cylinders |
| The quantity of what the sample constitutes | Approx 250 cy | From where was the sample collected | Source |
| First name of sampler or witnessed by | Skyler | Last name of sampler or witnessed by | Willcut |
| Title of sampler | QC Technician | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Reinforced Earth Co | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | RE4000 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 7773144 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | The samples were taken from tuck prior to pour at RECO manufacturing site in Victorville, CA | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2023-09-11-110-1 | ASTM C39-18: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens | Cole Hofberg, ZT Consulting Group, Incorporated | 09/25/2023 | 04/03/2025 | No | The cylinders are 2 for 7 days, 2 for 14 days, and last 2 for 28 days |
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2023-09-11-110-1 ASTM C39-18
| File Name | Extension | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|
| 230911 | 04/03/2025 | 2023-09-11-110-1 | Info |