Sample Record

DIME Sample ID 2025-03-24-44

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 1000860
DEA: 072XL304
EFIS: 0724000159
DIST-CO-RTE-PM07--,5-unknown
Award Date11/18/2023
Closeout Date01/26/2026
Work DescriptionLA-010,: Secure the sites, clean-up and remove hazardous mat
Location DescriptionNot set
QA Service Level1 (Verified on 12/17/2024)

Owner Lab

  • CT D08 - Fontana Southern Regional Laboratory

Sample Information

Sample Taken Date03/24/2025 Sample Unique Key44
Date that the sample was received by the laboratory/organization performing the testing03/27/2025 Sample typeVerification
A brief description of the sampleAsphalt Rubber Binder The quantity of what the sample constitutes1can
From where was the sample collectedSource First name of sampler or witnessed byJohn
Last name of sampler or witnessed byMejia Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameVulcan Irwindale
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Rubber Binder Asphalt modifier supplier
Performance GradePG 64-16 Lot number
Sublot number Asphalt Rubber Binder Mix Number

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-03-24-44-1ASTM D36-14ε1: Standard Test Method for Softening Point of Bitumen (Ring-and-Ball Apparatus) (Softening Point)Hussaya Leelakitrungruang, CT D08 - Fontana Southern Regional Laboratory04/02/202504/03/2025
Yes
04/03/2025Public - Test Data Visible
2025-03-24-44-2ASTM D217-16: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)Angelito Villegas, CT D08 - Fontana Southern Regional Laboratory04/02/202504/03/2025
Yes
04/03/2025Public - Test Data Visible
2025-03-24-44-3ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)Angelito Villegas, CT D08 - Fontana Southern Regional Laboratory04/02/202504/03/2025
Yes
04/03/2025Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-03-24-44-1 ASTM D36-14ε1 (Verified)
DIME Test ID: 2025-03-24-44-2 ASTM D217-16 (Verified)
DIME Test ID: 2025-03-24-44-3 ASTM D5329-16 (Verified)