Sample Record

DIME Sample ID 2025-03-24-1

Project Information

Project IdentifiersProject ID: 215620
DEA: 01436404
EFIS: 0100000193
DIST-CO-RTE-PM01-DN-101-35.8/36.5
Award Date07/11/2022
Closeout DateNot set
Work DescriptionDr. Fine Bridge Replacement
Location DescriptionDR. FINE BRIDGE REPLACEMENT FROM LAKE EARL DR TO S FRED D. HAIGHT DR ON HWY 101 ACROSS SMITH RIVER.
QA Service Level1 (Verified on 03/26/2021)

Owner Labs

  • CT SC - 3667 - Crescent City
  • CT D01 - District 1 Materials Laboratory

Sample Information

Sample Taken Date03/24/2025 Sample Unique Key1
Date that the sample was received by the laboratory/organization performing the testing03/26/2025 Sample typeQuality Assurance
A brief description of the sampleSR MINOR NA The quantity of what the sample constitutes9cy
From where was the sample collectedJob Site First name of sampler or witnessed byAndre
Last name of sampler or witnessed byWoods Title of sampler
Telephone number of sampler Laboratory sample identification2025-03-24
Linked DIME Sample ID The fabricator/manufacturer/facility nameTidewater Starry Plant
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameDr. Fine Bridge
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberSR Minor NA
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected62523
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBack of truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-03-24-1-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersJamie Kelley, CT D01 - District 1 Materials Laboratory04/01/202504/01/2025
Yes
04/01/20253/31/2025 3 @ 7 Day Break Public - Test Data Visible
2025-03-24-1-2CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersJamie Kelley, CT D01 - District 1 Materials Laboratory04/21/202504/21/2025
Yes
04/21/20254/21/2025 3 @ 28 Day BreakPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-03-24-1-1 CTM 521-June 2020 (Verified)
DIME Test ID: 2025-03-24-1-2 CTM 521-June 2020 (Verified)