Sample Record

Owner Lab

  • G3 Quality, Incorporated - Cerritos

DIME Sample ID 2025-02-20-45

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 1000402
DEA: 11430384
EFIS: 1118000114
DIST-CO-RTE-PM11-SD-805-23.7/28.5
Award Date10/09/2024
Closeout DateNot set
Work DescriptionREPLACE DRAINAGE, CONCRETE PAVEMENT, AND MODIFY ELECTRICAL SYSTEMS.
Location DescriptionSAN DIEGO COUNTY IN SAN DIEGO FROM 0.1 MILE NORTH OF ROUTE 805/52 SEPARATION TO ROUTE 5/805 SEPARATION
QA Service Level1 (Verified on 11/18/2024)

Sample Information

Sample Taken Date02/20/2025 Sample Unique Key45
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing02/21/2025
Sample typeQuality Control A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes25 From where was the sample collectedJob Site
First name of sampler or witnessed byAaron Last name of sampler or witnessed byLaughlin
Title of samplerQC Field Technician Telephone number of sampler
Laboratory sample identification4HEX4BM Set 1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameVanguard Construction Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number4HEX4BM
The truck number from where the sample was collectedLoad 1 The batch plant ticket number from where the sample was collectedUnknown
Concrete batch plant The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedTrial Slab Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-02-20-45-1CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement ConcreteAaron Laughlin, G3 Quality, Incorporated - Cerritos02/20/202503/21/2025
Yes
03/21/2025Public - Test Data Visible
2025-02-20-45-2CTM 518-June 2010: Method of Test for Unit Weight of Fresh ConcreteAaron Laughlin, G3 Quality, Incorporated - Cerritos02/20/202503/21/2025
Yes
03/21/2025Public - Test Data Visible
2025-02-20-45-3CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure MethodAaron Laughlin, G3 Quality, Incorporated - Cerritos02/20/202503/21/2025
Yes
03/21/2025Public - Test Data Visible
2025-02-20-45-4CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement ConcreteAaron Laughlin, G3 Quality, Incorporated - Cerritos02/20/202503/21/2025
Yes
03/21/2025Public - Test Data Visible
2025-02-20-45-5CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersAaron Laughlin, G3 Quality, Incorporated - Cerritos02/20/202503/21/2025
Yes
03/21/2025Public - Test Data Visible
2025-02-20-45-6CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersMario Salazar, G3 Quality, Incorporated - Cerritos02/23/202503/21/2025
Yes
03/21/2025Public - Test Data Visible
2025-02-20-45-7CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTristan Fortier, G3 Quality, Incorporated - Cerritos03/20/202503/21/2025
Yes
03/21/2025Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-02-20-45-1 CTM 557-June 2020 (Verified)
DIME Test ID: 2025-02-20-45-2 CTM 518-June 2010 (Verified)
DIME Test ID: 2025-02-20-45-3 CTM 504-June 2010 (Verified)
DIME Test ID: 2025-02-20-45-4 CTM 533-June 2010 (Verified)
DIME Test ID: 2025-02-20-45-5 CTM 521-June 2020 (Verified)
DIME Test ID: 2025-02-20-45-6 CTM 521-June 2020 (Verified)
DIME Test ID: 2025-02-20-45-7 CTM 521-June 2020 (Verified)