DIME Sample ID 2025-03-06-33

Project Information

Project IdentifiersProject ID: 209820
DEA: 04297634
EFIS: 0415000040
COOP: 042548
DIST-CO-RTE-PM04-ALA-84,680-17.9/21
Award Date02/19/2021
Closeout DateNot set
Work DescriptionROUTE 84 WIDENING (4-LANE EXPRESSWAY) FROM I-680 TO PIGEON PASS, INCLUDING INTERSECTION, DRAINAGE IMPROVEMENTS AND UTILITY RELOCATION.
Location DescriptionALAMEDA COUNTY IN AND NEAR SUNOL, PLEASANTON, AND LIVERMORE ON ROUTE 84 FROM 0.1 MILE EAST OF ROUTE 680 TO 0.1 MILE SOUTH OF RUBY HILL DRIVE AND ON ROUTE 680 FROM 1.2 MILES SOUTH TO 1.8 MILES NORTH OF ROUTE 84
QA Service Level1 (Verified on 11/04/2019)

Owner Lab

  • CT D04 - San Jose Construction Field Laboratory

Sample Information

Sample Taken Date03/06/2025 Sample Unique Key33
Date that the sample was received by the laboratory/organization performing the testing03/06/2025 Sample typeQuality Assurance
A brief description of the sampleAggregate Subbase The quantity of what the sample constitutes2500g
From where was the sample collectedJob Site First name of sampler or witnessed byFernando
Last name of sampler or witnessed byVega Title of samplerMREA
Telephone number of sampler Laboratory sample identificationSJ-030625-AS1
Linked DIME Sample ID The fabricator/manufacturer/facility nameMartin Marietta Sunol
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameHwy 680 SB Median South of Koopman Bridge "I-680" Line
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedjobsite - compacted aggregate subbase
Where the material sample would have been placed if not sampled

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-03-06-33-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesFernando Vega, CT D04 - San Jose Construction Field Laboratory03/06/202503/20/2025
Yes
03/13/2025Hwy 680 SB Median South of Koopman Bridge "I-680" Line.Public - Test Data Visible
2025-03-06-33-2CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesCharles Poolis, CT D04 - San Jose Construction Field Laboratory03/06/202503/20/2025
Yes
03/13/2025Hwy 680 SB Median South of Koopman Bridge "I-680" Line.Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-03-06-33-1 CTM 231-March 2013 (Verified)
DIME Test ID: 2025-03-06-33-2 CTM 216-June 2011 (Verified)