Sample Record
DIME Sample ID 2025-01-30-50
Project Information
| Project Identifiers | Project ID: 215038 DEA: 051J7804 EFIS: 0518000052 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-101-61.88/61.88 |
| Award Date | 10/22/2024 |
| Closeout Date | 07/02/2026 |
| Work Description | SAFETY IMPROVEMENTS |
| Location Description | WELLSONA SAFETY IMPROVEMENTS, SLO 101 |
| QA Service Level | 1 (Verified on 09/03/2020) |
Owner Lab
- CT D05 - Paso Robles Field Laboratory
Sample Information
| Sample Taken Date | 01/30/2025 | Sample Unique Key | 50 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 01/31/2025 | Sample type | Verification |
| A brief description of the sample | Structures concrete | The quantity of what the sample constitutes | 20 Cylinders |
| From where was the sample collected | Source | First name of sampler or witnessed by | Austin |
| Last name of sampler or witnessed by | Kirby | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | CalPortland | |
| Transportation Laboratory (TL) Number | 417 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 590RN1010 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 2067133 | |
| Concrete batch plant | CalPortland | The fabricator/manufacturer designation for the sample | |
| A detailed description of where the material sample was collected | Loaded Truck | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2025-01-30-50-1 CTM 521-June 2020 (Verified)
| File Name | Extension | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|
| 05-1J7804_35050_250227_ILC_590RN1010_TRIAL_BATCHES_001_42DAY | 03/13/2025 | 2025-01-30-50-1 | Info |
