Sample Record

Owner Lab

  • CT D06 - Millbrook Field Laboratory

DIME Sample ID 2025-02-19-16

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 1000115
DEA: 060Y7604
EFIS: 0619000024
DIST-CO-RTE-PM06-FRE-L5506,L5725-
Award Date05/08/2024
Closeout DateNot set
Work DescriptionMODIFICATION OF ELECTRICAL SYSTEM.
Location DescriptionFRESNO COUNTY IN FRESNO AT THE WEST AVENUE MAINTENANCE STATION 1283 NORTH WEST AVENUE AND AT THE DISTRICT OFFICE 1352 WEST OLIVE AVENUE
QA Service Level1 (Verified on 02/26/2024)

Sample Information

Sample Taken Date02/19/2025 Sample Unique Key16
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing02/19/2025
Sample typeAcceptance A brief description of the sample4x8 concrete cylinders
The quantity of what the sample constitutes3 concrete cylinders From where was the sample collectedJob Site
First name of sampler or witnessed byJonathon Last name of sampler or witnessed byChaney
Title of samplerTET Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameConstruction H Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number1416245
The truck number from where the sample was collected76214 The batch plant ticket number from where the sample was collected41202389
Concrete batch plantcemex The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBack of concrete truck, into wheelbarrow Where the material sample would have been placed if not sampledCT Yard
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-02-19-16-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTomas Silva, CT D06 - Millbrook Field Laboratory03/19/202503/19/2025
Yes
03/19/2025Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-02-19-16-1 CTM 521-June 2020 (Verified)