Sample Record

DIME Sample ID 2025-02-19-4

Project Information

Project IdentifiersProject ID: 1000115
DEA: 060Y7604
EFIS: 0619000024
DIST-CO-RTE-PM06-FRE-L5506,L5725-
Award Date05/08/2024
Closeout Date07/27/2026
Work DescriptionMODIFICATION OF ELECTRICAL SYSTEM.
Location DescriptionFRESNO COUNTY IN FRESNO AT THE WEST AVENUE MAINTENANCE STATION 1283 NORTH WEST AVENUE AND AT THE DISTRICT OFFICE 1352 WEST OLIVE AVENUE
QA Service Level1 (Verified on 02/26/2024)

Owner Lab

  • CT D06 - Millbrook Field Laboratory

Sample Information

Sample Taken Date02/19/2025 Sample Unique Key4
Date that the sample was received by the laboratory/organization performing the testing02/19/2025 Sample typeAcceptance
A brief description of the sample1/2 HMA ColdFeed The quantity of what the sample constitutes64 tons
From where was the sample collectedManufacturer First name of sampler or witnessed byJonathon
Last name of sampler or witnessed byChaney Title of samplerTET
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility namevulcan materials
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Vulcan Materials
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedColdfeed Chute
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments