Project Information

Project IdentifiersProject ID: 1000805
DEA: 061G0904
EFIS: 0623000237
DIST-CO-RTE-PM06-FRE-41-R28.2
Award Date07/10/2023
Closeout DateNot set
Work DescriptionFre 41 Santa Ana Pump Replace. Remove existing pump, install temporary pump, and replace pump and associated appurtenances.
Location DescriptionFresno County along Route 41 near PM R28.2 at Pump Plant between Shaw Ave and Santa Ana Ave.
QA Service Level1 (Verified on 11/19/2024)

Sample Information

Sample Taken Date01/28/2025 Sample Unique Key8
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/29/2025
Sample typeQuality Assurance A brief description of the sampleconcrete
The quantity of what the sample constitutes5cy From where was the sample collectedJob Site
First name of sampler or witnessed byMartin Last name of sampler or witnessed byGarcia
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameOutback Materials Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number80T3G36
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected176074
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete from wheelbarrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-01-28-8-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersGurjeet Litt, CT D06 - Millbrook Field Laboratory02/03/202502/03/2025
Yes
02/03/2025Required strenght 3600 psi @ 28 daysPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-01-28-8-1 CTM 521-June 2020 (Verified)