Sample Record
Owner Labs
- CT D06 - Fresno Construction Field Office
- CT HQ - FFS - Field Investigation Team (FIT)
- CT HQ - FFS - Skid Testing
DIME Sample ID 2025-01-21-5
Project Information
| Project Identifiers | Project ID: 215425 DEA: 06360244 EFIS: 0613000005 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-99-30.6/35.2 |
| Award Date | 04/23/2021 |
| Closeout Date | Not set |
| Work Description | Widen Freeway & Bridge Construction (Concrete Bridge) |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 11/01/2021) |
Sample Information
| Sample Taken Date | 01/21/2025 | Sample Unique Key | 5 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 01/21/2025 |
| Sample type | Acceptance | A brief description of the sample | Skid Testing Request |
| The quantity of what the sample constitutes | Multiple Lanes | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Ramandeep | Last name of sampler or witnessed by | Guraya |
| Title of sampler | Telephone number of sampler | 559-349-0447 | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Security Paving Inc | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 46-0279 | |
| Structure name | J Street Overcrossing | Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | PCC (Portland Cement Concrete) |
|---|---|---|---|
| Type of Traffic Control Provided | Behind K-Rail/Barrier | DIST-CO-RTE | 06-TUL-99 |
| Direction of Travel | East | Post Mile | 33.22 |
| Lanes to be Tested | Shoulder,Lane #1,Lane #2,Lane #3,Lane #4 | Station |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2025-01-21-5-2 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-01-21-5-3 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-01-21-5-4 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-01-21-5-5 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-01-21-5-6 CTM 342-August 2012 (Verified)
