Sample Record

Owner Lab

  • CT HQ - FFS - Skid Testing

DIME Sample ID 2025-01-15-21

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 993141
DEA: 060V1204
EFIS: 0616000207
DIST-CO-RTE-PM06-MAD-99-R6.9/R7.6
Award Date06/22/2022
Closeout Date12/02/2025
Work DescriptionCottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS.
Location DescriptionMADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING
QA Service Level1 (Verified on 07/28/2021)

Sample Information

Sample Taken Date01/15/2025 Sample Unique Key21
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/15/2025
Sample typeAcceptance A brief description of the sampleSkid Testing Request
The quantity of what the sample constitutesMultiple Lanes From where was the sample collectedJob Site
First name of sampler or witnessed byRyan Last name of sampler or witnessed byWilson
Title of sampler Telephone number of sampler916-601-9091
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameBuilders Concrete Sanger and Ashlan Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier20-
Structure nameJPCP on R5 line Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypeJPCP (Jointed Plain Concrete Pavement)
Type of Traffic Control ProvidedStationary Lane Closure DIST-CO-RTE06-MAD-99-R6.9/R7.6
Direction of TravelNorth Post Mile
Lanes to be TestedLane #1 Station26+90,29+50 and between R5 32+70

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-01-15-21-2CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing01/29/202501/29/2025
Yes
02/03/2025COTTON WOOD OFF RAMP INSIDE SHOULDER. OUTSIDE SHOULDER AVG .34 BOTH COMPLY. 10FT NEAR INNER SHOULDER AREA CLOSE TO WALL WAS TESTED DID NOT MEET SPECS AND ALSO 5FT NEAR OUTSIDE SHOULDER NEAR WALL DID NOT MEET SPECS BUT WAS TOLD THAT THAT AREA IS NOT IN THE REQUIREMENTS.Public - Test Data Visible
2025-01-15-21-3CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing01/29/202501/29/2025
Yes
02/03/2025COTTONWOOD OFF RAMP.VISUALLY INSPECTED ENTIRE ROADWAY SECTION AND ALSO TOOK RANDOM TESTS ALONG THE WAY, ALL NUMBERS WERE SIMILAR.. Public - Test Data Visible
2025-01-15-21-4CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing01/28/202501/29/2025
Yes
02/03/2025NB 99 COTTONWOOD BRIDGEPublic - Test Data Visible
2025-01-15-21-5CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing01/28/202501/29/2025
Yes
02/03/2025R5 BRIDGE LANES. VISUALLY INSPECTED ENTIRE SPAN AND ALSO RAN RANDOM TEST ALONG THE ROAD WITH BETTER NUMBERSPublic - Test Data Visible
2025-01-15-21-6CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing02/03/202501/29/2025
Yes
02/03/2025TERMINI LANE #4 AND SHOULDER. LANE #1 AND SHOULDERPublic - Test Data Visible
2025-01-15-21-7CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing02/03/202502/03/2025
Yes
02/03/2025TERMINI LANES #2 AND 3Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-01-15-21-2 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-01-15-21-3 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-01-15-21-4 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-01-15-21-5 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-01-15-21-6 CTM 342-August 2012 (Verified)
DIME Test ID: 2025-01-15-21-7 CTM 342-August 2012 (Verified)