Project Information
| Project Identifiers | Project ID: 993141 DEA: 060V1204 EFIS: 0616000207 |
|---|---|
| DIST-CO-RTE-PM | 06-MAD-99-R6.9/R7.6 |
| Award Date | 06/22/2022 |
| Closeout Date | 12/02/2025 |
| Work Description | Cottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS. |
| Location Description | MADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING |
| QA Service Level | 1 (Verified on 07/28/2021) |
Owner Lab
- CT D06 - Millbrook Field Laboratory
Sample Information
| Sample Taken Date | 01/10/2025 | Sample Unique Key | 17 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 01/13/2025 | Sample type | Quality Assurance |
| A brief description of the sample | Barrier rail stage 2 | The quantity of what the sample constitutes | 28CY |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Juan |
| Last name of sampler or witnessed by | De La Torre | Title of sampler | ASR |
| Telephone number of sampler | 559-363-0082 | Laboratory sample identification | 001 |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Builders | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | Mainline 99 cottonwood creek | |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | ND10531 |
|---|---|---|---|
| The truck number from where the sample was collected | 9128 | The batch plant ticket number from where the sample was collected | 1369394 |
| Concrete batch plant | Sanger | The fabricator/manufacturer designation for the sample | Builders |
| A detailed description of where the material sample was collected | Tail gate | Where the material sample would have been placed if not sampled | Stage 2 mainline barriers |
| From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2025-01-10-17-1 CTM 521-June 2020 (Verified)