Sample Record

DIME Sample ID 2025-01-09-14

Project Information

Project IdentifiersProject ID: 995361
DEA: 072XF604
EFIS: 0723000126
DIST-CO-RTE-PM07-VEN-33-24.25/27.3
Award Date03/02/2023
Closeout DateNot set
Work DescriptionRebuild the eroded side slopes, rebuild the damaged shoulders, reconstruct the dike, repair the sinkhole on the shoulder, repair the eroded areas next to EP, behind guardrail, and around the flumes, reinstall guardrail, rebuild RSP, clean the drainage systems, construct a SPW
Location DescriptionNot set
QA Service Level1 (Verified on 11/27/2023)

Owner Lab

  • CT D07 - Materials Field Laboratory, Unit 1953

Sample Information

Sample Taken Date01/09/2025 Sample Unique Key14
Date that the sample was received by the laboratory/organization performing the testing01/09/2025 Sample typeAcceptance
A brief description of the sampleHWY 33 PM24.75 The quantity of what the sample constitutes311 sy
From where was the sample collectedJob Site First name of sampler or witnessed bySopheak
Last name of sampler or witnessed byChong Title of samplerTEC
Telephone number of sampler2138170174 Laboratory sample identification25-0112
Linked DIME Sample ID The fabricator/manufacturer/facility nameGranite
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameHWY 33 PM24.75
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleSubgrade
The fabricator/manufacturer designation for the samplevarious location sugrade A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments