Sample Record

Owner Lab

  • CT D06 - Millbrook Field Laboratory

DIME Sample ID 2024-12-19-11

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 1000805
DEA: 061G0904
EFIS: 0623000237
DIST-CO-RTE-PM06-FRE-41-R28.2
Award Date07/10/2023
Closeout DateNot set
Work DescriptionFre 41 Santa Ana Pump Replace. Remove existing pump, install temporary pump, and replace pump and associated appurtenances.
Location DescriptionFresno County along Route 41 near PM R28.2 at Pump Plant between Shaw Ave and Santa Ana Ave.
QA Service Level1 (Verified on 11/19/2024)

Sample Information

Sample Taken Date12/19/2024 Sample Unique Key11
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/20/2024
Sample typeQuality Assurance A brief description of the samplePump Pedestal
The quantity of what the sample constitutes1CY From where was the sample collectedJob Site
First name of sampler or witnessed byAdam Last name of sampler or witnessed byMahmoud
Title of samplerASR Telephone number of sampler559-939-3921
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameOutback Materials Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier42-0381W
Structure nameSanta Ana Ave Pump Plant Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number63T1G01C
The truck number from where the sample was collected86 The batch plant ticket number from where the sample was collected173836
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete from wheelbarrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-12-19-11-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersGurjeet Litt, CT D06 - Millbrook Field Laboratory01/16/202501/16/2025
Yes
01/16/2025Public - Test Data Visible
2024-12-19-11-2CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersGurjeet Litt, CT D06 - Millbrook Field Laboratory01/30/202501/30/2025
Yes
01/30/2025Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-12-19-11-1 CTM 521-June 2020 (Verified)
DIME Test ID: 2024-12-19-11-2 CTM 521-June 2020 (Verified)