Sample Record

DIME Sample ID 2024-12-04-16

Project Information

Project IdentifiersProject ID: 994239
DEA: 010H0214
EFIS: 0118000107
DIST-CO-RTE-PM01-HUM-169-19.0/33.0
Award Date12/07/2022
Closeout Date08/21/2025
Work DescriptionCappell Walls
Location DescriptionHUMBOLDT COUNTY NEAR PECWAN FROM 3.4 MILES WEST OF CAPPELL CREEK BRIDGE TO 0.4 MILE EAST OF WEITCHPEC SCHOOL ROAD (Description of Work: Construct Soldier Pile Wall, Install Drainage, Place HMA (Type A))
QA Service Level1 (Verified on 09/22/2022)

Owner Lab

  • CT D01 - Boyd Road Field Laboratory

Sample Information

Sample Taken Date12/04/2024 Sample Unique Key16
Date that the sample was received by the laboratory/organization performing the testing10/23/2024 Sample typeQuality Assurance
A brief description of the sampleType II/V Cement The quantity of what the sample constitutes88 CY
From where was the sample collectedJob Site First name of sampler or witnessed bySam
Last name of sampler or witnessed byKaplan Title of samplerASR
Telephone number of sampler(707)496-0826 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameMercer Fraser Willow Crk
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier12-04E0051 Structure nameSchool Wall
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberMFWCCL2SLAG
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedWC107156
Concrete batch plantWillow Creek Mercer Fraser Plant The fabricator/manufacturer designation for the sampleBatch
A detailed description of where the material sample was collectedConcrete Chute Where the material sample would have been placed if not sampledStructural Concrete, Barrier Slab
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-12-04-16-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTom Brown, CT D01 - District 1 Materials Laboratory12/11/202412/11/2024
Yes
12/11/20247 Day Break 12/11/24Public - Test Data Visible
2024-12-04-16-2CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTom Brown, CT D01 - District 1 Materials Laboratory12/18/202412/18/2024
Yes
12/18/202412/18/24 14 Day BreakPublic - Test Data Visible
2024-12-04-16-3CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTom Brown, CT D01 - District 1 Materials Laboratory01/01/202501/01/2025
Yes
01/01/202528 Day Break 1/1/25Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-12-04-16-1 CTM 521-June 2020 (Verified)
DIME Test ID: 2024-12-04-16-2 CTM 521-June 2020 (Verified)
DIME Test ID: 2024-12-04-16-3 CTM 521-June 2020 (Verified)