DIME Sample ID 2024-11-02-8

Project Information

Project IdentifiersProject ID: 995193
DEA: 07356604
EFIS: 0719000026
DIST-CO-RTE-PM07-LA-605-R10.2/20.2
Award Date04/04/2024
Closeout DateNot set
Work DescriptionLANE & SLAB REPLACEMENT, COLD PLANE & HMA OVERLAY.
Location DescriptionLOS ANGELES COUNTY IN SANTA FE SPRINGS, PICO RIVERA, WHITTIER, CITY OF INDUSTRY AND EL MONTE FROM TELEGRAPH ROAD UNDERCROSSING TO ROUTE 605/10 SEPARATION
QA Service Level1 (Verified on 10/03/2023)

Sample Information

Sample Taken Date11/02/2024 Sample Unique Key8
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/02/2024
Sample typeAcceptance A brief description of the sampleLane #2 on the SB 605
The quantity of what the sample constitutes120 CY From where was the sample collectedJob Site
First name of sampler or witnessed byCaesar Last name of sampler or witnessed byRamirez
Title of samplerTransportation Engineer Civil Telephone number of sampler(818) 974-8391
Laboratory sample identification24-3399 Linked DIME Sample ID
The fabricator/manufacturer/facility nameContractor Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameLane #2 on the SB 605 Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberVCTS675
The truck number from where the sample was collected3 The batch plant ticket number from where the sample was collected3
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedJob site Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-11-02-8-1CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteCaesar Ramirez, CT D07 - Materials Field Laboratory, Unit 195311/05/202411/26/2024
Yes
11/26/2024430 psi after 60 minutes reported to inspector Alexander DagherPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-11-02-8-1 CTM 524-March 2013 (Verified)