DIME Sample ID 2024-11-06-14

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 993141
DEA: 060V1204
EFIS: 0616000207
DIST-CO-RTE-PM06-MAD-99-R6.9/R7.6
Award Date06/22/2022
Closeout Date12/02/2025
Work DescriptionCottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS.
Location DescriptionMADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING
QA Service Level1 (Verified on 07/28/2021)

Owner Lab

  • CT D06 - Millbrook Field Laboratory

Sample Information

Sample Taken Date11/06/2024 Sample Unique Key14
Date that the sample was received by the laboratory/organization performing the testing11/07/2024 Sample typeQuality Assurance
A brief description of the sampleStage 2 Approach Slab The quantity of what the sample constitutes105 CY
From where was the sample collectedJob Site First name of sampler or witnessed byJuan
Last name of sampler or witnessed byDe La Torre Title of samplerASR
Telephone number of sampler5593630082 Laboratory sample identification215
Linked DIME Sample ID The fabricator/manufacturer/facility nameBuilders
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier41-0089 Structure nameMainline 99
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberND22023
The truck number from where the sample was collected9165 The batch plant ticket number from where the sample was collected1307199
Concrete batch plant Ashlan The fabricator/manufacturer designation for the sampleBuilders
A detailed description of where the material sample was collectedTAIL GATE Where the material sample would have been placed if not sampledMainline 99 abutment 1 approach slab
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-11-06-14-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersGurjeet Litt, CT D06 - Millbrook Field Laboratory12/05/202412/05/2024
Yes
12/05/2024Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-11-06-14-1 CTM 521-June 2020 (Verified)