Sample Record
Owner Lab
- CT D06 - Bakersfield Field Laboratory
DIME Sample ID 2024-10-31-37
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 995242 DEA: 060Y1304 EFIS: 0619000010 |
---|---|
DIST-CO-RTE-PM | 06-KER-33-40.4/59.3 |
Award Date | 06/20/2024 |
Closeout Date | Not set |
Work Description | COLD PLANE, PLACE HMA AND RHMA-G, AND REPLACE CULVERTS. |
Location Description | KERN COUNTY ABOUT 8 MILES NORTH OF MCKITTRICK FROM CYMRIC WASH BRIDGE TO 0.8 MILE SOUTH OF ROUTE 46 |
QA Service Level | 1 (Verified on 09/03/2024) |
Sample Information
Sample Taken Date | 10/31/2024 | Sample Unique Key | 37 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/01/2024 |
Sample type | Acceptance | A brief description of the sample | PCC |
The quantity of what the sample constitutes | supported slab | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Mike | Last name of sampler or witnessed by | Cozad |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Golden empire Wasco | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | NCT109013 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 208163081 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | BACK OF THE TRUCK | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2024-10-31-37-1 CTM 521-June 2020 (Verified)
File Name | Extension | Date Uploaded | Test ID | Actions |
---|---|---|---|---|
06-0Y1304_37053_241031_21_7D | 11/07/2024 | 2024-10-31-37-1 | Info |
DIME Test ID: 2024-10-31-37-2 CTM 521-June 2020 (Verified)
File Name | Extension | Date Uploaded | Test ID | Actions |
---|---|---|---|---|
06-0Y1304_37053_241031_21_14D | 11/14/2024 | 2024-10-31-37-2 | Info |