Sample Record
DIME Sample ID 2016-03-28-2
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 211450 DEA: 033F3604 EFIS: 0312000216 |
|---|---|
| DIST-CO-RTE-PM | 03--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 10/19/2016) |
Owner Lab
- CT HQ - Sacramento Aggregate Testing Laboratory
Sample Information
| Sample Taken Date | 03/28/2016 | Sample Unique Key | 2 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 02/23/2017 | Sample type | Quality Control |
| A brief description of the sample | SOUTHSIDE PARK VIADUCT | The quantity of what the sample constitutes | 1 BAG |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | FERNANDO |
| Last name of sampler or witnessed by | DE HARO | Title of sampler | Unknown |
| Telephone number of sampler | Unknown | Laboratory sample identification | 17SOIL-0029 |
| Linked DIME Sample ID | Unknown | The fabricator/manufacturer/facility name | NA |
| Transportation Laboratory (TL) Number | C637023 | Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown |
| Structure unique identifier | Not set | Structure name | Not set |
| Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Unknown |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | Unknown | A detailed description of where the material sample was collected | RC-16-001 |
| Where the material sample would have been placed if not sampled | 88 TO 100 FT |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2016-03-28-2-1 AGGLP SIEVE_ANALYSIS-1 (Verified)
