Sample Record

DIME Sample ID 2024-10-08-21

Project Information

Project IdentifiersProject ID: 215425
DEA: 06360244
EFIS: 0613000005
DIST-CO-RTE-PM06-TUL-99-30.6/35.2
Award Date04/26/2021
Closeout Date08/31/2026
Work DescriptionWiden Freeway & Bridge Construction (Concrete Bridge)
Location DescriptionNot set
QA Service Level1 (Verified on 11/01/2021)

Owner Lab

  • CT D06 - Visalia Field Laboratory

Sample Information

Sample Taken Date10/08/2024 Sample Unique Key21
Date that the sample was received by the laboratory/organization performing the testing10/09/2024 Sample typeQuality Assurance
A brief description of the sample3/4 RHMA-G The quantity of what the sample constitutes10 Boxes 4 Bags 2 Cans
From where was the sample collectedSource First name of sampler or witnessed byMartika
Last name of sampler or witnessed byHall Title of samplerPlant Inspector
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameMartin Marietta - Visalia
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeRHMA-G
HMA Grading3/4 inch Lot number9
Sublot number6 HMA Mix Number
Binder content (%)Not set Virgin binder PGNot set
Design binder PGNot set Binder SupplierNot set
RAP content (%)Not set WMA AdditivesNot set
Antistrip typeNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-10-08-21-1CTM 375-February 2012: Determining the Density and Relative Compaction of Data Cores (lab)Chris Elias, CT D06 - Visalia Field Laboratory10/09/202410/09/2024
Yes
10/09/2024Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-10-08-21-1 CTM 375-February 2012 (Verified)