Project Information

Project IdentifiersProject ID: 993141
DEA: 060V1204
EFIS: 0616000207
DIST-CO-RTE-PM06-MAD-99-R6.9/R7.6
Award Date06/22/2022
Closeout Date12/02/2025
Work DescriptionCottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS.
Location DescriptionMADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING
QA Service Level1 (Verified on 07/28/2021)

Sample Information

Sample Taken Date09/25/2024 Sample Unique Key43
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/26/2024
Sample typeQuality Assurance A brief description of the sampleRetaining wall 1 stem
The quantity of what the sample constitutes64 CY From where was the sample collectedJob Site
First name of sampler or witnessed byJuan Last name of sampler or witnessed byDe La Torre
Title of samplerASR Telephone number of sampler559-363-0082
Laboratory sample identification198 Linked DIME Sample ID
The fabricator/manufacturer/facility nameReady Mix Builders Concrete- Ashlan Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameRetaining wall 1 Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberND10531
The truck number from where the sample was collected9149 The batch plant ticket number from where the sample was collected1306875
Concrete batch plantAshlan The fabricator/manufacturer designation for the sampleBuilders Ashlan
A detailed description of where the material sample was collectedTail gate Where the material sample would have been placed if not sampledRetaining wall 1 sta 10+03.86 to 10+77
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2024-09-25-43-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersGurjeet Litt, CT D06 - Millbrook Field Laboratory10/23/202410/23/2024
Yes
10/23/2024Result failed,Need 3600 psi @28 daysPublic - Test Data Visible
2024-09-25-43-2CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersGurjeet Litt, CT D06 - Millbrook Field Laboratory11/06/202411/06/2024
Yes
11/06/2024Required compressive strenght 3600 psi @ 28 daysPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-09-25-43-1 CTM 521-June 2020 (Verified)
DIME Test ID: 2024-09-25-43-2 CTM 521-June 2020 (Verified)