Sample Record
Owner Lab
- CT D04 - Concord Field Laboratory
DIME Sample ID 2024-09-12-47
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 994378 DEA: 040K6304 EFIS: 0416000111 |
---|---|
DIST-CO-RTE-PM | 04-NAP-29-16.4/19.0 |
Award Date | 06/27/2023 |
Closeout Date | Not set |
Work Description | BRIDGE RAIL REPLACEMENT AND SHOULDER WIDENING. |
Location Description | NAPA COUNTY NEAR YOUNTVILLE AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF DRY CREEK BRIDGE TO 0.1 MILE NORTH OF CALIFORNIA DRIVE UNDERCROSSIG |
QA Service Level | 1 (Verified on 10/27/2022) |
Sample Information
Sample Taken Date | 09/12/2024 | Sample Unique Key | 47 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/12/2024 |
Sample type | Quality Assurance | A brief description of the sample | PCC Aggregates |
The quantity of what the sample constitutes | 18 CY | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Dan | Last name of sampler or witnessed by | Ringler |
Title of sampler | Lab Technician | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Shamrock Napa Plant | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | CEMEX Cach Creek Madison |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Belt at Plant | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | D20115EA | Lot number | |
Sublot number | Aggregate Mix Number |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2024-09-12-47-1 CTM 202-November 2011 (Verified)
DIME Test ID: 2024-09-12-47-2 CTM 202-November 2011 (Verified)
DIME Test ID: 2024-09-12-47-3 CTM 227-December 2014 (Verified)
DIME Test ID: 2024-09-12-47-4 CTM 217-June 2011 (Verified)