Sample Record

DIME Sample ID 2024-06-07-68

Project Information

Project IdentifiersProject ID: 993905
DEA: 034H5814
EFIS: 0320000240
DIST-CO-RTE-PM03-SAC-5-27.6/29.5,30.4/34.3
Award Date02/28/2023
Closeout Date06/02/2025
Work DescriptionROADWAY EXCAVATION, PLACE CL2 AB, HMA & RHMA, & MODIFY RAMP METERS.
Location DescriptionSACRAMENTO COUNTY IN AND NEAR SACRAMENTO FROM 0.5 MILES SOUTH OF ARENA BOULEVARD OVERCROSSING TO 0.4 MILES SOUTH OF 99/5 INTERCHANGE AND FROM 0.5 MILES NORTH OF THE 99/5 INTERCHANGE TO 0.4 MILE SOUTH OF THE YOLO COUNTY LINE
QA Service Level1 (Verified on 06/27/2022)

Owner Lab

  • Blackburn Consulting

Sample Information

Sample Taken Date06/07/2024 Sample Unique Key68
Date that the sample was received by the laboratory/organization performing the testing06/07/2024 Sample typeQuality Assurance
A brief description of the sample1/2" RWHM-O, PG 64-16 The quantity of what the sample constitutes1 Can
From where was the sample collectedSource First name of sampler or witnessed byDustin
Last name of sampler or witnessed byKliethermes Title of sampler
Telephone number of sampler Laboratory sample identification3764
Linked DIME Sample ID2024-06-07-79 The fabricator/manufacturer/facility nameDeSilva Gates Marysville
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 64-16
ModifiedNo Lot number1
Sublot number7 Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierValero Marketing & Supply - Benicia CA MultigradeNo
Multigrade Type Asphalt Binder Mix Number
HMA TypeNot set HMA Supplier Mix ID NumberNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments