Sample Record

DIME Sample ID 2023-09-06-17

Project Information

Project IdentifiersProject ID: 995087
DEA: 051P5904
EFIS: 0522000086
DIST-CO-RTE-PM05-SCR-1-0.0/5.0
Award Date03/22/2023
Closeout Date08/13/2024
Work DescriptionCold plane, RHMA-G
Location DescriptionWatsonville area, County line to Scenic pullout
QA Service Level1 (Verified on 08/21/2023)

Owner Labs

  • CT D05 - Santa Cruz Field Laboratory
  • CT HQ - Sacramento Asphalt Binder Laboratory

Sample Information

Sample Taken Date09/06/2023 Sample Unique Key17
Date that the sample was received by the laboratory/organization performing the testing09/06/2023 Sample typeQuality Assurance
A brief description of the sampleARB pg 64-16 The quantity of what the sample constitutes2-1 Qt Cans
From where was the sample collectedSource First name of sampler or witnessed byWesley
Last name of sampler or witnessed byRider Title of samplerTET
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameNational Blending Company
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Rubber Binder Asphalt modifier supplierSan Joaquin Refining Co Inc
Performance GradePG 64-16 Lot number1
Sublot number2 Asphalt Rubber Binder Mix Number23_1354

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments