Sample Record

Owner Labs

  • CT D05 - Monterey Construction Field Laboratory
  • CT HQ - Sacramento Asphalt Binder Laboratory

DIME Sample ID 2023-02-15-32

Project Information

Project IdentifiersProject ID: 993490
DEA: 051M4604
EFIS: 0519000154
DIST-CO-RTE-PM05-MON-1-44.5
Award Date03/02/2022
Closeout Date06/26/2023
Work DescriptionCONSTRUCT RETAINING WALL, WIDENING SHOULDER AND PLACE HMA. Highway 1 at Coastlands Rd Soldier Pile Wall.
Location DescriptionMONTEREY COUNTY NEAR BIG SUR AT 1.0 MILE SOUTH OF PFEIFFER CANYON BRIDGE
QA Service Level1 (Verified on 01/19/2022)

Sample Information

Sample Taken Date02/15/2023 Sample Unique Key32
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing02/16/2023
Sample typeQuality Assurance A brief description of the sampleSS-1H Tack Coat
The quantity of what the sample constitutes1 Jug From where was the sample collectedJob Site
First name of sampler or witnessed byWesley Last name of sampler or witnessed byRider
Title of samplerTET Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGraniterock Redwood City Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphaltic Emulsion Emulsion GradeSS-1h
Lot NumberNot set Sub LotNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments