Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16941-16950 of 17620 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
1000219Project ID: 1000219
DEA: 101L5704
EFIS: 1020000035
MINOR: 10A2636
10---   1 (04/02/2024)Details CEM-3701 Report
995503Project ID: 995503
Permit Numbers: 0223NSN0345
02-SHA-273-16.91Reconstruct CG&S, striping and signal & lighting modifications. To include Ameron arm and pole.Permit project - Trinity Street Bikeway 1 (01/03/2024)Details CEM-3701 Report
995504Project ID: 995504
DEA: 101R8804
EFIS: 1023000243
10-SJ-4-14.15Emergency bridge repair for Garwood Bridge (Bridge No. 29-0050) on State Route 4 at postmile 14.15 in San Joaquin County. A fire incident under the bridge has affected the steel members of the structure. The project scope includes clearing of waste, cleaning, heat straightening, replacement, sandingOn State Route 4 at postmile 14.15 in San Joaquin County NOT VERIFIEDDetails CEM-3701 Report
995505Project ID: 995505
Permit Numbers: 06226SN0463
06--SR119-The work is included as part of the development of the northeast corner of SR 119 and South H Street. The proposed development will be a Love's Truck Stop. As part of the off-site work, the northeast return in the intersection will be modified, which will trigger traffic signal modifications. AsNortheast corner of SR 119 and South H Street. 1 (11/27/2023)Details CEM-3701 Report
995514Project ID: 995514
DEA: 024J8204
EFIS: 0223000077
02-MOD-299-14.7/20.0SCHAFFER MT CHIP - PLACE ASPHALT RUBBER CHIP SEAL WITH REPLACE AC SURFACING.MODOC COUNTY NEAR CANBY FROM 0.1 MILE EAST OF COUNTY ROAD 85 TO 1.7 MILES WEST OF ROUTE 139 1 (12/29/2023)Details CEM-3701 Report
995515Project ID: 995515
DEA: 034H8904
EFIS: 0319000072
03-ED-50-75.4/80MODIFY LIGHTING AND FIBER OPTIC CABLE SYSTEMS.EL DORADO COUNTY IN SOUTH LAKE TAHOE FROM NORTH JUNCTION ROUTE 89 TO PIONEER TRAIL 1 (01/17/2024)Details CEM-3701 Report
995506Project ID: 995506
EFIS: 1121000254
11-SD--Install a pedestrian staggered mid-block crosswalk (z-crossing) with pedestrian hybrid beacon to connect pedestrians and bicyclists to the east and west sides of El Camino Real.  NOT VERIFIEDDetails CEM-3701 Report
995507Project ID: 995507
EFIS: 1118000003
11-SD--   NOT VERIFIEDDetails CEM-3701 Report
995508Project ID: 995508
DEA: 061F4304
COOP: 061781
Permit Numbers: 0623NSN0151
06-FRE-201-0.7/0.91City of Kingsburg - install ped crossings with RRFB beacons on poles.  1 (12/29/2023)Details CEM-3701 Report
995509Project ID: 995509
DEA: 101Q2504
EFIS: 1022000258
MINOR: 10A2550
10---   1 (12/04/2023)Details CEM-3701 Report