Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15481-15490 of 18099 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993901 | Project ID: 993901 DEA: 07308904 | 07-LA-101- | Upgrade existing irrigation systems | 1 (09/22/2022) | Details CEM-3701 Report | ||
993903 | Project ID: 993903 DEA: 030H2504 | 03-SAC-51-4 | repair culvert by jack and bore method | 06/27/2022 | 1 (06/27/2022) | Details CEM-3701 Report | |
993904 | Project ID: 993904 DEA: 042J4204 | 04-SM-1-47.1 | washout along shoulder | 05/22/2023 | 1 (07/21/2022) | Details CEM-3701 Report | |
993905 | Project ID: 993905 DEA: 034H5814 EFIS: 0320000240 | 03-SAC-5-27.6/29.5,30.4/34.3 | ROADWAY EXCAVATION, PLACE CL2 AB, HMA & RHMA, & MODIFY RAMP METERS. | SACRAMENTO COUNTY IN AND NEAR SACRAMENTO FROM 0.5 MILES SOUTH OF ARENA BOULEVARD OVERCROSSING TO 0.4 MILES SOUTH OF 99/5 INTERCHANGE AND FROM 0.5 MILES NORTH OF THE 99/5 INTERCHANGE TO 0.4 MILE SOUTH OF THE YOLO COUNTY LINE | 1 (06/27/2022) | Details CEM-3701 Report | |
993906 | Project ID: 993906 DEA: 051H0504 EFIS: 0516000018 | 05-MON-101-87.4/87.8 | WIDEN ROADWAY WITH HMA, CONSTRUCT RETAINING WALL AND CONCRETE BARRIER. | MONTEREY COUNTY IN SALINAS FROM 0.1 MILE NORTH OF EAST MARKET STREET UNDERCROSSING TO 0.1 MILE SOUTH OF SHERWOOD DRIVE OVERCROSSING | 03/03/2025 | 1 (06/17/2022) | Details CEM-3701 Report |
993907 | Project ID: 993907 DEA: 061E2004 EFIS: 0621000225 | 06-MAD-99,152-24.8,7.3 | REPAIR BRIDGE DECK AND PLACE POLYESTER CONCRETE OVERLAY. | MADERA COUNTY NEAR CHOWCHILLA ON ROUTE 99 AT BERENDA SLOUGH BRIDGE AND ON ROUTE 152 AT ASH SLOUGH BRIDGE | 04/22/2024 | 1 (07/06/2022) | Details CEM-3701 Report |
993908 | Project ID: 993908 DEA: 11427104 EFIS: 1116000154 | 11-SD-8-3.0/8.3 | MODIFY SIGNAL & LIGHTING SYSTEMS & REPLACE MINOR CONCRETE CURB RAMP. | SAN DIEGO COUNTY IN SAN DIEGO AT VARIOUS LOCATIONS FROM MISSION CENTER ROAD OVERCROSSING TO COLLEGE AVENUE OVERCROSSING | 09/26/2024 | 1 (11/01/2022) | Details CEM-3701 Report |
993909 | Project ID: 993909 DEA: 120T8504 EFIS: 1222000108 | 12-ORA/ORA-5,22,405-42.0/42.0, 10.43/10.43, .95/.95 | Remove the old failed joint assembly units placing new steel joint assembly units, place trafficrated steel plates over the failed joint assembly units | 12/02/2022 | 1 (07/26/2022) | Details CEM-3701 Report | |
993910 | Project ID: 993910 DEA: 081N3304 EFIS: 0822000162 | 08-SBD/SBD-18-20.6/23.4 | Reconstruct embankment, remove masonry gravity walls, construct retaining systems, replace AC pavement, reinforce base, and rock scaling. | 01/23/2023 | 1 (01/23/2023) | Details CEM-3701 Report | |
993911 | Project ID: 993911 DEA: 071XY804 EFIS: 0722000229 | 07-LA/LA-47-RO 42/1.98 | Fabricate and paint metal cable guards and install them onto the main cables of the Vincent Thomas Bridge | 04/24/2024 | 1 (07/22/2022) | Details CEM-3701 Report |