Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14801-14810 of 17993 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993176 | Project ID: 993176 DEA: 024H6904 EFIS: 0219000039 MINOR: 02A1983 | 02-SHA-151-0/4.95 | Shasta Dam Culverts | 08/14/2023 | 1 (08/23/2021) | Details CEM-3701 Report | |
993177 | Project ID: 993177 DEA: 081M4704 EFIS: 0821000123 MINOR: 08A3329 | 08--- | 1 (08/11/2021) | Details CEM-3701 Report | |||
993178 | Project ID: 993178 Permit Numbers: 04186MC1118 | 04-SCL-9-9.6 | Removal and replacement of portions of existing curb, gutter, and roadway. | 18840 Los Gatos-Saratoga Road in Monte Sereno on Austin Way at Highway 9. | 10/28/2024 | 1 (08/04/2021) | Details CEM-3701 Report |
993179 | Project ID: 993179 Permit Numbers: 0421NOP1472 | 04-SCL--48.6 | The project will construct improvements along Shoreline Boulevard (Blvd) within the limits of the US 101 Interchange. The project improvements include conversion of the existing median to a reversible bus lane, elimination of access from northbound Shoreline Blvd to State Route 85 (SR85), construct | Shoreline Blvd. , Mountain View | 09/13/2022 | 1 (09/02/2021) | Details CEM-3701 Report |
993180 | Project ID: 993180 Permit Numbers: 04216MC1118 | 04-SCL-9-9.6 | Removal and replacement of portions of existing curb and gutter, and roadway.We wish to reopen this encroachment permit to complete the relocation of the existing Beacon Light and pavement striping.Previously approved work was incomplete due to construction delays. No modifications have been made t | 18840 Los Gatos-Saratoga Road, Monte Sereno | NOT VERIFIED | Details CEM-3701 Report | |
993181 | Project ID: 993181 DEA: 031H5904 EFIS: 0316000187 | 03-BUT-99- | Eaton Rd I/C Roundabout | 1 (08/20/2021) | Details CEM-3701 Report | ||
993182 | Project ID: 993182 DEA: 024F5204 EFIS: 0213000002 | 02-SIS-5-R9.9/R68.1 | ROADWAY EX, HYDRAULIC BIOTIC GROWTH MED. AND MIDWEST GUARDRAIL SYSTEM. | SISKIYOU COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE NORTH OF REAM AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF HILT ROAD OVERCROSSING | 10/06/2022 | 1 (08/23/2021) | Details CEM-3701 Report |
993183 | Project ID: 993183 DEA: 031H2704 EFIS: 0316000082 | 03-YUB-70-R11.2/13.5 | UPGRADE BRIDGE RAILS & CONSTRUCT CONCRETE MEDIAN BARRIER. | YUBA COUNTY NEAR LINDA AND MARYSVILLE FROM 2.4 MILES SOUTH OF FEATHER RIVER BOULEVARD UNDERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD | 1 (08/16/2021) | Details CEM-3701 Report | |
993184 | Project ID: 993184 DEA: 040A7724 EFIS: 0420000288 COOP: 0422825 | 04-ALA-80-6.4/6.8 | Excavation, HMA, structural concrete, minor concrete and drainage. | IN BERKELEY AND ALBANY FROM 0.6 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.3 MILE SOUTH OF EL CERRITO SEPARATION AND OVERHEAD | 1 (04/08/2022) | Details CEM-3701 Report | |
993713 | Project ID: 993713 DEA: 11430334 EFIS: 1121000129 | 11-SD-5-0.3/36 | The project includes anchor, core, and satellite assets consisting of: pavement preservation; bridge preservation; drainage system restoration; transportation management systems; overhead sign structures and sign panels replacement. | I-5 corridor from the Camino de la Plaza Overcrossing near the San Ysidro Land Port of Entry to 0.3 miles south of the Via de la Valle Undercrossing in San Diego, and on SR-905 at Milepost 12 | 1 (04/08/2022) | Details CEM-3701 Report |