Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14001-14010 of 18128 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215023 | Project ID: 215023 DEA: 060U4704 EFIS: 0615000301 | 06-KER,KIN-5-81.7/87.0,0.0/0.3 | CONSTRUCT CRCP, JPCP AND INSTALL TRAFFIC MONITORING STATIONS. | KERN AND KINGS COUNTIES NEAR KETTELMAN CITY FROM 0.6 MILE SOUTH OF TWISSELMAN ROAD OVERCROSSING TO 0.3 MILE NORTH OF KERN/KINGS COUNTY LINE | 06/27/2023 | 1 (06/17/2020) | Details CEM-3701 Report |
215024 | Project ID: 215024 DEA: 07311604 EFIS: 0715000011 | 07-LA-134-2.6/4.8 | PLACE ROCK BLANKET, MINOR CONCRETE AND MODIFY IRRIGATION SYSTEM. | LOS ANGELES COUNTY IN BURBANK AND LOS ANGELES FROM BOB HOPE DRIVE UNDERCROSSING TO RIVERSIDE DRIVE OVERCROSSING | 1 (09/02/2020) | Details CEM-3701 Report | |
215025 | Project ID: 215025 DEA: 09363404 EFIS: 0915000002 | 09-INY-178-43.4 | CONSTRUCT BOX CULVERTS. | INYO COUNTY NEAR SHOSHONE AT 0.5 MILE EAST OF SOUTH JUNCTION ROUTE 178 | 04/27/2021 | 1 (10/30/2020) | Details CEM-3701 Report |
215026 | Project ID: 215026 DEA: 100X6704 EFIS: 1016000027 | 10-STA-99-R13.9/R17.5 | INSTALL SLOPE PAVING, MINOR CONCRETE AND PLACE HOT MIX ASPHALT. | STANISLAUS COUNTY IN AND NEAR MODESTO AT VARIOUS LOCATIONS FROM SOUTH MODESTO UNDERCROSSING TO WOODLAND AVENUE OVERCROSSING | 09/23/2021 | 1 (06/15/2020) | Details CEM-3701 Report |
215027 | Project ID: 215027 DEA: 101H3424 EFIS: 1018000078 | 10-SJ-5-10.6 | BRIDGE RAIL REPLACEMENT. | SAN JOAQUIN COUNTY NEAR LATHROP AT DEUEL OVERHEAD | 05/03/2022 | 1 (06/15/2020) | Details CEM-3701 Report |
215028 | Project ID: 215028 DEA: 120Q6904 EFIS: 1217000088 | 12-ORA-5,22,55,57,73,etc-var | RECONSTRUCT INDUCTIVE, VEHICLE DETECTION, AND RAMP METERING SYSTEMS. | ORANGE COUNTY AT VARIOUS LOCATIONS | 10/27/2022 | 1 (11/12/2020) | Details CEM-3701 Report |
215029 | Project ID: 215029 DEA: 120Q8504 EFIS: 1217000116 | 12-ORA-5-34.5/37.4 | PLACE POLYESTER CONCRETE ON 3 BRIDGES & REPLACE CONCRETE BARRIERS. | ORANGE COUNTY IN ORANGE AND ANAHEIM FROM 0.1 MILE NORTH OF SANTA ANA RIVER BRIDGE TO HARBOR BOULEVARD OVERCROSSING | 07/08/2022 | 1 (09/01/2020) | Details CEM-3701 Report |
215045 | Project ID: 215045 DEA: 010F4604 EFIS: 0116000010 | 01-HUM-299-20.5/30.2 | PLACE HMA & RHMA-O; & CONSTRUCT MECHANICALLY STABILIZED EMBANKMENT. | HUMBOLDT COUNTY ABOUT 15 MILES EAST OF BLUE LAKE AT VARIOUS LOCATIONS FROM 1.5 MILES EAST OF BAIR ROAD TO 0.4 MILE WEST OF CEDAR CREEK ROAD | 10/13/2023 | 1 (07/24/2020) | Details CEM-3701 Report |
215044 | Project ID: 215044 Permit Numbers: 04206DP1416 0418NRD1503 0419NRT3359 0420NRW1236 0420NRD1452 | 04---5 | Installation of Class ll bicycle facilities in both directions along Tunnel Road/Caldecott Lane,Concrete sidewalk and ADA pedestrian ramps on north side of Tunnel Road/Caldescott Lane and retaining walls to accommodate installation of sidewalk between approximately 540 ft. east of Hill Drive to SR2 | tunnel Road/Caldecott Lane, Oakland | 04/27/2023 | 1 (11/02/2020) | Details CEM-3701 Report |
215043 | Project ID: 215043 DEA: 041W2104 EFIS: 0420000347 | 04-ALA,ALA-880-14.5, 14.54 | Repair concrete girder, deck, barrier rail | Industrial Blvd OC, NB 880 (bridge 33-0398) | 08/09/2021 | 1 (06/25/2020) | Details CEM-3701 Report |