Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13971-13980 of 16654 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215066 | Project ID: 215066 DEA: 120P0904 EFIS: 1215000034 | 12-ORA-5-10.3,23.2 | RECONSTRUCT SLOPE AND INSTALL CONCRETE BARRIER, DITCH AND PLANTING. | ORANGE COUNTY IN SAN JUAN CAPISTRANO AND IRVINE AT 0.6 MILE SOUTH OF JUNIPERO ROAD UNDERCROSSING AND AT 0.1 MILE NORTH OF ROUTE 133/5 SEPARATION | 11/18/2021 | 1 (10/23/2020) | Details CEM-3701 Report |
215474 | Project ID: 215474 DEA: 061A8904 EFIS: 0620000179 | 06-KER-43-25.2/38.8 | PLACE RHMA-G AND HMA. | KERN COUNTY NEAR WASCO FROM ROUTE 46 TO TULARE COUNTY LINE | 12/01/2021 | 1 (02/16/2021) | Details CEM-3701 Report |
215069 | Project ID: 215069 DEA: 060S1404 EFIS: 0614000094 MINOR: 06A2611 | 06--- | 08/16/2023 | 1 (07/13/2020) | Details CEM-3701 Report | ||
215070 | Project ID: 215070 Permit Numbers: 0420NMC0738 04206DP1106 | 04---13.3 | This project consists of the reconstruction and expansion of an existing sidewalk facility and modification to an existing traffic signal to provide a pedestrian and bicycle crossing for a local bike-way/trail project. | Ashby AVE., Berkeley | 08/09/2021 | 1 (08/18/2020) | Details CEM-3701 Report |
215071 | Project ID: 215071 EFIS: 0000020505 Permit Numbers: 11206CD0440 | 11---15/-1 | to perform intersection improvements consisting of the demolition and replacement of the existing north east curb return, pedestrian ramp, and sidewalk associated with the widening of Carroll Canyon Road. The existing traffic signal and equipment on the north east corner of the intersection will b | INTERSTATE-15, SAN DIEGO | 08/24/2021 | 1 (07/17/2020) | Details CEM-3701 Report |
215174 | Project ID: 215174 DEA: 023H5404 EFIS: 0217000137 | 02-SIS-96-67.2/70.9 | Gap Fire Drainage Enchancement | 07/27/2023 | 1 (09/11/2020) | Details CEM-3701 Report | |
215072 | Project ID: 215072 DEA: 59000000 | 59--- | CITY OF PLEASANTON: 5 BRIDGES, 33C0454, 33C0099, 33C0453, 33C0461, AND 33C0462. BRIDGE PREVENTIVE MAINTENANCE PROJECT : Laurel Creek Dr | 0.4 mi W of Remove and replace existing Type A joint seal at both Alameda Pleasanton 33C0454 29 Laurel Creek Dr Laurel Creek Foothill Rd 97.7 abutment joints. 5,909.00 $53,000.00 $8.97 $46,920.90 $55,773.90 $6,079.10 $7,226.10 3 Install soffit access openings to provide access to box City of 400 ft | NOT VERIFIED | Details CEM-3701 Report | |
215073 | Project ID: 215073 DEA: 034H5604 EFIS: 0318000332 | 03-PLA-65-R12.9/R13.1 | CONSTRUCT SLOPE PAVING AND PLACE EROSION CONTROL. | PLACER COUNTY IN LINCOLN AT THE SOUTH INGRAM SLOUGH BRIDGE | 09/23/2021 | 1 (09/10/2020) | Details CEM-3701 Report |
215074 | Project ID: 215074 DEA: 050Q5004 EFIS: 0500020288 | 05-MON-1-20.4 | PLACE 63" DOWNDRAIN, GUARDRAIL AND RECONSTRUCT HISTORIC HEADWALL. | MONTEREY COUNTY NEAR LUCIA AT 0.6 MILE SOUTH OF LIMEKILN CREEK BRIDGE | 08/17/2022 | 1 (09/03/2020) | Details CEM-3701 Report |
215075 | Project ID: 215075 DEA: 060Q9104 EFIS: 0614000005 | 06-TUL-99-19.2/19.8 | BRIDGE DECK AND OUTSIDE GIRDER REPLACEMENT. | TULARE COUNTY NEAR TIPTON FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF AVENUE 152 OVERCROSSING | 05/11/2023 | 1 (07/28/2020) | Details CEM-3701 Report |